Asian Carp and the Great Lakes Region (Paperback)
Language: English
Published by Createspace Independent Publishing Platform, 2012
- Softcover
- New

Seller: CitiRetail, Stevenage, United KingdomCitiRetail
AbeBooks seller since June 29, 2022
Condition: New
£ 18.49
Quantity: 1 available
Add to basketItem description from seller
Paperback. Four species of non-indigenous Asian carp are expanding their range in U.S. waterways, resulting in a variety of concerns and problems. Three species-bighead, silver, and black carp-are of particular note, based on the perceived degree of environmental concern. Current controversy relates to what measures might be necessary and sufficient to prevent movement of Asian carp from the Mississippi River drainage into the Great Lakes through the Chicago Area Waterway System. Several bills have been introduced in the 112th Congress to direct actions to avoid the possibility of carp becoming established in the Great Lakes. According to the Great Lakes Fishery Commission, Asian carp pose a significant threat to commercial and recreational fisheries of the Great Lakes. Asian carp populations could expand rapidly and change the composition of Great Lakes ecosystems. Native species could be harmed because Asian carp are likely to compete with them for food and modify their habitat. It has been widely reported that Great Lakes fisheries generate economic activity of approximately $7 billion annually. Although Asian carp introduction is likely to modify Great Lakes ecosystems and cause harm to fisheries, studies forecasting the extent of potential harm are not available. Therefore, it is not possible to provide estimates of potential changes in the regional economy or economic value (social welfare) by lake, species, or fishery. The locks and waterways of the Chicago Area Waterway System (CAWS) have been a focal point for those debating how to prevent Asian carp encroachment on the Great Lakes. The CAWS is the only navigable link between the Great Lakes and the Mississippi River, and many note the potential of these waterways to facilitate invasive species transfers from one basin to the other. The U.S. Army Corps of Engineers constructed and is currently operating electrical barriers to prevent fish passage through these waterways. In light of recent indications that Asian carp may be present upstream of the barriers, increased federal funding to prevent fish encroachment was announced by the Obama Administration. Part of this funding is being spent by the Corps of Engineers to explore options relating to the "hydrologic separation" of the Great Lakes and Mississippi River drainage basins. The potential closure of navigation structures in the CAWS is of particular interest to both the Chicago area shipping industry and Great Lakes fishery interests. Since December 2010, Michigan and other Great Lakes states have filed a number of requests for court ordered measures to stop the migration of invasive Asian carp toward Lake Michigan from the Mississippi River basin via the CAWS. The U.S. Supreme Court denied several motions for injunctions to force Illinois, the U.S. Army Corps of Engineers, and the Metropolitan Water Reclamation District of Greater Chicago to take necessary measures to prevent the carp from entering Lake Michigan. Michigan, Minnesota, Ohio, Pennsylvania, and Wisconsin sought a separate order in federal district court seeking similar relief, which was also denied. In the 112th Congress, language in P.L. 112-74 authorized the Corps of Engineers to take emergency measures to exclude Asian carp from the Great Lakes. In addition, H.R. 892 and S. 471 would direct federal agencies to take measures to control the spread of Asian carp. Notably, each of these bills, as well as H.R. 4406 and S. 2317, would require the Corps of Engineers to complete the Chicago portion of a study on hydrologic separation of the Great Lakes and Mississippi River Basin within 18 months of enactment. H.R. 2432 would require the Corps of Engineers to prepare an economic impact statement before carrying out any federal action relating to the Chicago Area Water System. H.R. 4146 and S. 2164 would authorize the Corps of Engineers to take ac Shipping may be from our UK warehouse or from our Australian or US warehouses, depending on stock availability.…
Seller Inventory # 9781480151833
- Title
- Asian Carp and the Great Lakes Region (Paperback)
- Author
- Harold F. Upton
- Publisher
- Createspace Independent Publishing Platform
- Publication year
- 2012
- Condition
- new
- Binding
- Paperback
- Language
- English
- ISBN 10
- 1480151831
- ISBN 13
- 9781480151833
"Synopsis" may belong to another edition of this title.
CitiRetail
Stevenage, United Kingdom
AbeBooks seller since June 29, 2022
Shipping rates from United Kingdom to U.S.A.
| Item | 7 to 14 business days | 7 to 60 business days |
|---|---|---|
| First item | £ 37.00 | £ 37.00 |
Payment methods
Store description
Online business
Seller's business information
ABC BOOKS LIMITED
10 John Street
London, United Kingdom WC1N 2EB
Terms of sale
Orders can be returned within 30 days of receipt.
Right of withdrawal
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to CitiRetail, Stevenage, United Kingdom, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
- The delivery of newspapers, journals or magazines with the exception of subscription contracts; and
- The supply of digital content which is not supplied on a tangible medium (e.g. on a CD or DVD) if you accepted when you placed your order that we could start to deliver it, and that you could not withdraw once delivery had started.
Shipping terms
Please note that titles are dispatched from our US, Canadian or Australian warehouses. Delivery times specified in shipping terms. Orders ship within 2 business days. Delivery to your door then takes 7-14 days.