Architectural Project Delivery (Paperback)
Language: English
Published by Independently Published, 2026
- Softcover
- New

Seller: CitiRetail, Stevenage, United KingdomCitiRetail
AbeBooks seller since June 29, 2022
Condition: New
£ 65.99
Quantity: 1 available
Add to basketItem description from seller
Paperback. The drawings were complete. The contract was signed. The schedule was baselined. And the project still stalled in a conference room, because no one could say who was entitled to decide, what information had to exist before the decision was valid, or what record would authorize the field to act on it.That failure is structural rather than technical. Delivery method, procurement method, contract form, management model, and production system are routinely discussed as though they were a single decision. They are five, and confusing them is the most common and most expensive error in capital delivery. The consequences surface later as unclear design liability, price certainty that arrives too late to matter, risk sitting with the party least able to carry it, changes priced before anyone classified them, and a closeout that stops rather than ends.This twenty-chapter guide separates those layers and rebuilds them into a working model, from owner readiness through post-occupancy review. The treatment is procedural rather than theoretical: where a decision requires a document, the document is named; where a process depends on a response time, the response time is discussed. Read it straight through as a course in delivery, or open it at the chapter that matches the decision on your desk this week.Inside this guide you will: Tell the five delivery choices apart and make each one deliberately, then match a method to the project through selection criteria, public-sector constraints, and a side-by-side comparison of the major delivery families.Test whether an owner organization is genuinely ready, using decision rights, risk appetite, budget architecture, and a readiness gate that precedes procurement.Run design-build with discipline: team organization, qualifications and best-value procurement, criteria packages and bridging documents, design-to-release gates, and construction-phase administration.Make integration real rather than nominal, through validation, risk pool and incentive structure, open-book cost, lean planning, and information and model governance.Convert contract documents into governed field action through submittals, requests for information, supplemental instructions, observation planned around irreversibility, testing, and defensible disposition of nonconforming work.Classify change before pricing it, test the build-up rather than the bottom line, evaluate time impact on cause and logic, and certify payment applications on evidence.Close projects on criteria rather than optimism: substantial completion, punch lists, commissioning, owner training, record documents, warranties, and final payment.The apparatus is built for daily use: sixty analytical figures, worked scenarios from public institutional, healthcare, university and civic projects, chapter sources, a glossary of working terms, and three appendices giving a delivery method comparison matrix, a construction administration document register, and a grouped closeout checklist.One caution belongs at the front. The book discusses standard contract families and industry practice in general terms. It is not legal advice and cannot describe the agreement you signed; your executed documents, your jurisdiction, and your counsel govern.It is written for the people who carry delivery risk: owners and owner representatives who must select a method and live with it, architects and engineers administering construction contracts, design-build and construction management practitioners, project and program managers, public agency capital staff, and students and examination candidates who need the reasoning behind the terminology rather than the terminology alone.Open this guide at the decision in front of you and start running pro Shipping may be from our UK warehouse or from our Australian or US warehouses, depending on stock availability.…
Seller Inventory # 9798170464289
- Title
- Architectural Project Delivery (Paperback)
- Author
- Nolan C. Whitmore
- Publisher
- Independently Published
- Publication year
- 2026
- Condition
- new
- Binding
- Paperback
- Language
- English
- ISBN 13
- 9798170464289
The drawings were complete. The contract was signed. The schedule was baselined. And the project still stalled in a conference room, because no one could say who was entitled to decide, what information had to exist before the decision was valid, or what record would authorize the field to act on it.
That failure is structural rather than technical. Delivery method, procurement method, contract form, management model, and production system are routinely discussed as though they were a single decision. They are five, and confusing them is the most common and most expensive error in capital delivery. The consequences surface later as unclear design liability, price certainty that arrives too late to matter, risk sitting with the party least able to carry it, changes priced before anyone classified them, and a closeout that stops rather than ends.
This twenty-chapter guide separates those layers and rebuilds them into a working model, from owner readiness through post-occupancy review. The treatment is procedural rather than theoretical: where a decision requires a document, the document is named; where a process depends on a response time, the response time is discussed. Read it straight through as a course in delivery, or open it at the chapter that matches the decision on your desk this week.
Inside this guide you will:
- Tell the five delivery choices apart and make each one deliberately, then match a method to the project through selection criteria, public-sector constraints, and a side-by-side comparison of the major delivery families.
- Test whether an owner organization is genuinely ready, using decision rights, risk appetite, budget architecture, and a readiness gate that precedes procurement.
- Run design-build with discipline: team organization, qualifications and best-value procurement, criteria packages and bridging documents, design-to-release gates, and construction-phase administration.
- Make integration real rather than nominal, through validation, risk pool and incentive structure, open-book cost, lean planning, and information and model governance.
- Convert contract documents into governed field action through submittals, requests for information, supplemental instructions, observation planned around irreversibility, testing, and defensible disposition of nonconforming work.
- Classify change before pricing it, test the build-up rather than the bottom line, evaluate time impact on cause and logic, and certify payment applications on evidence.
- Close projects on criteria rather than optimism: substantial completion, punch lists, commissioning, owner training, record documents, warranties, and final payment.
The apparatus is built for daily use: sixty analytical figures, worked scenarios from public institutional, healthcare, university and civic projects, chapter sources, a glossary of working terms, and three appendices giving a delivery method comparison matrix, a construction administration document register, and a grouped closeout checklist.
One caution belongs at the front. The book discusses standard contract families and industry practice in general terms. It is not legal advice and cannot describe the agreement you signed; your executed documents, your jurisdiction, and your counsel govern.
It is written for the people who carry delivery risk: owners and owner representatives who must select a method and live with it, architects and engineers administering construction contracts, design-build and construction management practitioners, project and program managers, public agency capital staff, and students and examination candidates who need the reasoning behind the terminology rather than the terminology alone.
Open this guide at the decision in front of you and start running project delivery as a system instead of inheriting one by default.
"Synopsis" may belong to another edition of this title.
CitiRetail
Stevenage, United Kingdom
AbeBooks seller since June 29, 2022
Shipping rates from United Kingdom to U.S.A.
| Item | 7 to 14 business days | 7 to 60 business days |
|---|---|---|
| First item | £ 37.00 | £ 37.00 |
Payment methods
Store description
Online business
Seller's business information
ABC BOOKS LIMITED
10 John Street
London, United Kingdom WC1N 2EB
Terms of sale
Orders can be returned within 30 days of receipt.
Right of withdrawal
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to CitiRetail, Stevenage, United Kingdom, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
- The delivery of newspapers, journals or magazines with the exception of subscription contracts; and
- The supply of digital content which is not supplied on a tangible medium (e.g. on a CD or DVD) if you accepted when you placed your order that we could start to deliver it, and that you could not withdraw once delivery had started.
Shipping terms
Please note that titles are dispatched from our US, Canadian or Australian warehouses. Delivery times specified in shipping terms. Orders ship within 2 business days. Delivery to your door then takes 7-14 days.