Analyzing Air Force Security Posture on Typical Industrial Control Systems Servicing Critical Infrastructures
Language: English
Published by Biblioscholar, 2012
- Softcover
- New

Seller: California Books, Miami, FL, U.S.A.California Books
AbeBooks seller since October 27, 2023
Condition: New
£ 14.47
Quantity: Over 20 available
Add to basketSeller Inventory # I-9781288254729
- Title
- Analyzing Air Force Security Posture on Typical Industrial Control Systems Servicing Critical Infrastructures
- Author
- Boling, Jonathan
- Publisher
- Biblioscholar
- Publication year
- 2012
- Condition
- New
- Binding
- Soft cover
- Language
- English
- ISBN 10
- 1288254725
- ISBN 13
- 9781288254729
Today's Air Force bases employ automated systems controlling critical functions such as power delivery, water processing, heating, ventilation and air conditioning (HVAC), and fuels delivery. These control systems have proliferated exponentially in the past several decades. Systems that were once manual or stand-alone are now automated and interconnected, vastly increasing reliability, convenience, and productivity, while decreasing maintenance costs and other costs of ownership. These conveniences come with a downside: the increase in risk of disruption, directly hampering mission accomplishment, due to both natural and manmade disturbances. Factor in recently emerging threats such as the Stuxnet malware, and these vulnerabilities become more relevant. This research analyzes how Air Force Industrial Control Systems (ICS) are intricately tied to mission accomplishment at Air Force bases, and evaluates risk in the implementation, maintenance, and operation of these systems in a more holistic way. From this research, it is clear that Air Force ICS are at all levels of automation and maturity, from manual and electro-mechanical to fully processor-controlled. Further, Air Force ICSs are implemented in non-standardized ways, each unique to the systems involved, making it difficult to generalize the risks involved with interconnectivity. Finally, it is evident that at one large Air Force base, ICS system operators from cyber, civil engineering, security forces, operations, and maintenance functional areas do not understand how their systems rely on other base critical infrastructures. To solve these problems, stakeholders from all involved functional areas, at multiple staff levels, will need to collaborate, evaluate, prioritize, and execute to reduce risk.
This work has been selected by scholars as being culturally important, and is part of the knowledge base of civilization as we know it. This work was reproduced from the original artifact, and remains as true to the original work as possible. Therefore, you will see the original copyright references, library stamps (as most of these works have been housed in our most important libraries around the world), and other notations in the work.
This work is in the public domain in the United States of America, and possibly other nations. Within the United States, you may freely copy and distribute this work, as no entity (individual or corporate) has a copyright on the body of the work.
As a reproduction of a historical artifact, this work may contain missing or blurred pages, poor pictures, errant marks, etc. Scholars believe, and we concur, that this work is important enough to be preserved, reproduced, and made generally available to the public. We appreciate your support of the preservation process, and thank you for being an important part of keeping this knowledge alive and relevant.
"Synopsis" may belong to another edition of this title.
California Books
Miami, FL, U.S.A.
AbeBooks seller since October 27, 2023
Shipping rates within U.S.A.
| Item | 3 to 7 business days | 2 to 5 business days |
|---|---|---|
| First item | £ 0.00 | £ 8.87 |
Payment methods
Store description
Specialty
All authorized categoriesSeller's business information
Miramar International Services LLC
Right of withdrawal
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to California Books, Fort Wayne, Indiana, U.S.A., without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
- The delivery of newspapers, journals or magazines with the exception of subscription contracts; and
- The supply of digital content which is not supplied on a tangible medium (e.g. on a CD or DVD) if you accepted when you placed your order that we could start to deliver it, and that you could not withdraw once delivery had started.