Analysis of Pile Foundations Subject to Static and Dynamic Loadin
Amir M. Kaynia
Sold by Books Puddle, New York, NY, U.S.A.
AbeBooks Seller since 22 November 2018
New - Hardcover
Condition: New
Ships within U.S.A.
Quantity: 3 available
Add to basketSold by Books Puddle, New York, NY, U.S.A.
AbeBooks Seller since 22 November 2018
Condition: New
Quantity: 3 available
Add to basket1st edition NO-PA16APR2015-KAP.
Seller Inventory # 26386306205
This book presents computational tools and design principles for piles used in a wide range of applications and for different loading conditions. The chapters provide a mixture of basic engineering solutions and latest research findings in a balanced manner. The chapters are written by world-renowned experts in the field. The materials are presented in a unified manner based on both simplified and rigorous numerical methods.
The first four chapters present the basic elements and steps in analysis of piles under static and cyclic loading together with clear references to the appropriate design regulations in Eurocode 7 when relevant. The analysis techniques cover conventional code-based methods, solutions based on pile-soil interaction springs, and advanced 3D finite element methods. The applications range from conventional piles to large circular steel piles used as anchors or monopiles in offshore applications.
Chapters 5 to 10 are devoted to dynamic and earthquake analyses and design. These chapters cover a range of solutions from dynamic pile-soil springs to elasto-dynamic solutions of large pile groups. Both linear and nonlinear soil behaviours are considered along with response due to dynamic loads and earthquake shaking including possible liquefaction.
The book is unique in its unified treatment of the solutions used for static and dynamic analysis of piles with practical examples of application. The book is considered a valuable tool for practicing engineers, graduate students and researchers.
Amir M. Kaynia is Technical Expert in Vibration and Earthquake Engineering at NGI, and Adjunct Professor at Dept. of Structural Engineering, Norwegian University of Science and Technology (NTNU). He has received his BSc in Civil Engineering from Tehran University and his MSc and PhD degrees in Structural Engineering from Massachusetts Institute of Technology (MIT). His areas of research and practice include Earthquake Engineering, Soil Dynamics and Soil-Structure Interaction. He has published more than 200 papers in peer reviewed journals and international conference proceedings, has authored 6 book chapters, and has held numerous keynote lectures worldwide. Amir Kaynia has led major international design projects onshore and offshore and has coordinated several research projects funded by the European Commission and the Norwegian Research Council related to offshore wind energy, earthquake engineering and vibrations from high-speed lines. He is member of several national and international scientific committees dealing with earthquake engineering and soil-structure interaction. He is also Chairman of the Norwegian Standards Earthquake Committee and is member of the Project Team for revision of Part 5 of Eurocode 8.
"About this title" may belong to another edition of this title.
We accept return for those books which are received damamged. Though we take appropriate care in packaing to avoid such situation.
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to Books Puddle, New York, New York, U.S.A., without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
| Order quantity | 12 to 19 business days | 12 to 14 business days |
|---|---|---|
| First item | £ 3.02 | £ 5.30 |
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.