Ageing and Life Extension of Offshore Structures: The Challenge of Managing Structural Integrity
G Ersdal
New - Hardcover
Condition: New
Ships from Germany to U.S.A.
Quantity: Over 20 available
Add to basketCondition: New
Quantity: Over 20 available
Add to basketÜber den AutorGerhard Ersdal has had an interest in existing structures and especially the safety of older structures for most of his engineering career. He received his MSc in structural engineering in 1991 and then worke.
Seller Inventory # 267046563
A comprehensive overview of managing and assessing safety and functionality of ageing offshore structures and pipelines
A significant proportion, estimated at over 50%, of the worldwide infrastructure of offshore structures and pipelines is in a life extension phase and is vulnerable to ageing processes. This book captures the central elements of the management of ageing offshore structures and pipelines in the life extension phase. The book gives an overview of: the relevant ageing processes and hazards; how ageing processes are managed through the life cycle, including an overview of structural integrity management; how an engineer should go about assessing a structure that is to be operated beyond its original design life, and how ageing can be mitigated for safe and effective continued operation.
Key Features:
The book gives an updated summary of current practice and research on the topic of the management of ageing structures and pipelines in the life extension phase but also meets the needs of structural engineering students and practicing offshore and structural engineers in oil & gas and engineering companies. In addition, it should be of value to regulators of the offshore industry.
Gerhard Ersdal has had an interest in existing structures and especially the safety of older structures for most of his engineering career. He received his MSc in structural engineering in 1991 and then worked for eight years in a major engineering company in Norway, (Multiconsult) designing primarily offshore structures and bridges and also working on the restoration of many historic buildings in Norway. In 1999, he joined the Norwegian Petroleum Directorate and conducted research on the safety of older offshore structures in a PhD programme at the University of Stavanger. He received his PhD on life extension of ageing offshore structures in 2005. He is the project manager for the Norwegian Petroleum Safety Authority's Ageing and Life Extension research programme, with responsibility for several workshops, conferences and papers on the topic. In 2013, he was awarded a professorship at the University in Stavanger on ageing and life extension of structures.
Prof. John V. Sharp has over 35 years' experience in offshore & marine engineering, with particular interests in offshore technology, safety, life extension, structural integrity, risk management and renewable energy. He was responsible for the UK Health & Safety Executive's £6M offshore health & safety research programme between 1993 and 1996, with particular interests in structural integrity and risk management. He has been a Visiting Professor at Cranfield University since 1996, which includes lecturing and teaching on Master's Courses on offshore engineering and renewables (offshore wind, wave and tidal). Sharp is also a Commissioner for Alderney Commission for Renewable Energy (since 2010), with specific interests in tidal energy. He has also undertaken consultancy work for a number of organisations, which has included assessment and management of ageing offshore installations, life extension, performance indicator measures for organisational capability for both structural integrity and asset maintenance.
Dr. Alexander Stacey is a Structural Integrity Specialist Inspector in the Energy Division of the Hazardous Installations Directorate of the UK Health & Safety Executive. He graduated from the University of London's Imperial College with a degree in Mechanical Engineering and a Ph.D. on research in fatigue and fracture mechanics. He was subsequently employed as a Fracture Mechanics Specialist in the Offshore Division of Lloyd's Register. In his current role as a Structural Integrity Specialist in the Energy Division of the Health and Safety Executive, his primary interest is the structural integrity management of offshore installations throughout the lifecycle. Principal activities include the inspection of duty holders' structural integrity management systems, the assessment of safety cases, the development of guidance, codes and standards and supporting R&D. A key area of interest is the management of ageing and life extension of the UK's offshore infrastructure.
"About this title" may belong to another edition of this title.
Instructions for revocation/
Standard Business Terms and customer information/ data protection declaration
Revocation right for consumers
(A ?consumer? is any natural person who concludes a legal transaction which, to an overwhelming extent, cannot be attributed to either his commercial or independent professional activities.)
Instructions for revocation
Revocation right
You have the right to revoke this contract within one month without specifying any reasons.
The revocation period is one month...
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to moluna, Greven, Germany, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
II. Kundeninformationen
Moluna GmbH
Engberdingdamm 27
48268 Greven
Deutschland
Telefon: 02571/5698933
E-Mail: abe@moluna.de
Wir sind nicht bereit und nicht verpflichtet, an Streitbeilegungsverfahren vor Verbraucherschlichtungsstellen teilzunehmen.
Die technischen Schritte zum Vertragsschluss, der Vertragsschluss selbst und die Korrekturmöglichkeiten erfolgen nach Maßgabe der Regelungen "Zustandekommen des Vertrages" unserer Allgemeinen Geschäftsbedingungen (Teil I.).
3.1. Vertragssprache ist deutsch .
3.2. Der vollständige Vertragstext wird von uns nicht gespeichert. Vor Absenden der Bestellung können die Vertragsdaten über die Druckfunktion des Browsers ausgedruckt oder elektronisch gesichert werden. Nach Zugang der Bestellung bei uns werden die Bestelldaten, die gesetzlich vorgeschriebenen Informationen bei Fernabsatzverträgen und die Allgemeinen Geschäftsbedingungen nochmals per E-Mail an Sie übersandt.
Die wesentlichen Merkmale der Ware und/oder Dienstleistung finden sich im jeweiligen Angebot.
5.1. Die in den jeweiligen Angeboten angeführten Preise sowie die Versandkosten stellen Gesamtpreise dar. Sie beinhalten alle Preisbestandteile einschließlich aller anfallenden Steuern.
5.2. Die anfallenden Versandkosten sind nicht im Kaufpreis enthalten. Sie sind über eine entsprechend bezeichnete Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot aufrufbar, werden im Laufe des Bestellvorganges gesondert ausgewiesen und sind von Ihnen zusätzlich zu tragen, soweit nicht die versandkostenfreie Lieferung zugesagt ist.
5.3. Die Ihnen zur Verfügung stehenden Zahlungsarten sind unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot ausgewiesen.
5.4. Soweit bei den einzelnen Zahlungsarten nicht anders angegeben, sind die Zahlungsansprüche aus dem geschlossenen Vertrag sofort zur Zahlung fällig.
6.1. Die Lieferbedingungen, der Liefertermin sowie gegebenenfalls bestehende Lieferbeschränkungen finden sich unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot.
Soweit im jeweiligen Angebot oder unter der entsprechend bezeichneten Schaltfläche keine andere Frist angegeben ist, erfolgt die Lieferung der Ware innerhalb von 3-5 Tagen nach Vertragsschluss (bei vereinbarter Vorauszahlung jedoch erst nach dem Zeitpunkt Ihrer Zahlungsanweisung).
6.2. Soweit Sie Verbraucher sind ist gesetzlich geregelt, dass die Gefahr des zufälligen Untergangs und der zufälligen Verschlechterung der verkauften Sache während der Versendung erst mit der Übergabe der Ware an Sie übergeht, unabhängig davon, ob die Versendung versichert oder unversichert erfolgt. Dies gilt nicht, wenn Sie eigenständig ein nicht vom Unternehmer benanntes Transportunternehmen oder eine sonst zur Ausführung der Versendung bestimmte Person beauftragt haben.
Sind Sie Unternehmer, erfolgt die Lieferung und Versendung auf Ihre Gefahr.
Die Mängelhaftung richtet sich nach der Regelung "Gewährleistung" in unseren Allgemeinen Geschäftsbedingungen (Teil I).
letzte Aktualisierung: 23.10.2019
| Order quantity | 26 to 60 business days | 26 to 60 business days |
|---|---|---|
| First item | £ 41.85 | £ 41.85 |
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.