Ageing of Infrastructure: A Life-Cycle Approach
Collins, Frank; Blin, Frédéric
Sold by Books Puddle, New York, NY, U.S.A.
AbeBooks Seller since 22 November 2018
New - Soft cover
Condition: New
Ships within U.S.A.
Quantity: 3 available
Add to basketSold by Books Puddle, New York, NY, U.S.A.
AbeBooks Seller since 22 November 2018
Condition: New
Quantity: 3 available
Add to basketThe book addresses the problem of ageing infrastructure and how ageing can reduce the service life below expected levels. The rate of ageing is affected by the type of construction material, environmental exposure, function of the infrastructure, and loading: each of these factors is considered in the assessment of ageing. How do international design codes address ageing? Predictive models of ageing behaviour are available and the different types (empirical, deterministic, and probabilistic) are discussed in a whole-of-life context. Life cycle plans, initiated at the design stage, can ensure that the design life is met, while optimising the management of the asset: reducing life cycle costs and reducing the environmental footprint due to less maintenance/remediation interventions and fewer unplanned stoppages and delays. Health monitoring of infrastructure can be conducted via implanted probes (wired or wireless) or by non-destructive testing that can routinely measure the durability, loading, and exposure environments at key locations around the facility. Routine monitoring can trigger preventative maintenance that can extend the life of the infrastructure and minimise unplanned and reactive remediation, while also providing ongoing data that can be utilised towards more durable future construction. Future infrastructure will need to be safe and durable, financially and environmentally sustainable over the lifecycle, thereby raising socio-economic wellbeing. The book concludes by discussing the key impacting factors that will need to be addressed. The author brings a strong academic and industry background to present a resource for academics and practitioners wishing to address the ageing of built infrastructure.
Professor Frank Collins
Professor Frank Collins is the Director of the Australian Centre for Infrastructure Durability (ACID). His role involves fostering collaboration between universities to streamline access by government and industry to the most relevant researchers and facilities for the durability of built infrastructure. Prior to his academic career, Frank’s has had 19 years as a chartered professional engineer, which gives him a unique perspective on ageing of infrastructure. He worked for 13 years with Taywood Engineering Ltd in their London, Hong Kong, Sydney and Melbourne offices; involved with diagnosis and rehabilitation of infrastructure and applications of construction materials. In 1988, Frank was Lead Materials Engineer in the Sydney Opera House rehabilitation program which entailed diagnosis of the roof shell elements and substructure, and development of remedial and preventative maintenance works. In 1995, he established the Bridge Testing and Rehabilitation Unit within the Ministry of Transport, Vietnam, allowing the Ministry to become self-sufficient in the management of bridge assets. While technical director at AECOM (Maunsell) he established and managed the company’s Advanced Materials Group, including technical and commercial leadership, and provided high-level advice on many international infrastructure projects.
As an academic since 2006, he has taken akeen research interest in the areas of durability and ageing of built infrastructure; utilisation of wastes as alternative construction materials; and improved construction materials for durable and stronger infrastructure.
Dr Frederic Blin
Frédéric has over 18 years’ experience as an engineer and is the leader of AECOM’s Strategic Asset Management and Advanced Materials team in Victoria, Tasmania and South Australia. He has worked across industries (properties/facilities, transport and water) and brings a solid understanding of the importance of balancing asset lifecycle risks and costs to provide desired service levels to customers. He holds a materials engineering degree and a PHD in corrosion engineering.
At AECOM, Frédéric is a Technical Director, who has worked on and led numerous projects in the field of asset management and durability/materials engineering. This has included the provision of technical support at the design, build, finance (including due diligences) and operation & maintain phases of the lifecycle of (particularly infrastructure-based) assets (e.g. parks, tunnels, ports, plants, buildings, roads and bridges).
Frédéric’s experience include condition and performance monitoring and evaluation, risk management and lifecycle decision frameworks and tools, maintenance and renewals forecasting as well as asset management business improvement.
"About this title" may belong to another edition of this title.
We accept return for those books which are received damamged. Though we take appropriate care in packaing to avoid such situation.
If you are a consumer you can cancel the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
INFORMATION REGARDING THE RIGHT OF CANCELLATION
Statutory Right to cancel
You have the right to cancel this contract within 14 days without giving any reason.
The cancellation period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the the last good or the last lot or piece.
To exercise the right to cancel, you must inform us, Books Puddle, 244 Madison Ave, Suite # 405, 10016, New York, New York, U.S.A., +1 7183015977, of your decision to cancel this contract by a clear statement (e.g. a letter sent by post, fax or e-mail). You may use the attached model cancellation form, but it is not obligatory. You can also electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". If you use this option, we will communicate to you an acknowledgement of receipt of such a cancellation on a durable medium (e.g. by e-mail) without delay.
To meet the cancellation deadline, it is sufficient for you to send your communication concerning your exercise of the right to cancel before the cancellation period has expired.
Effects of cancellation
If you cancel this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to cancel with contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to us or Books Puddle, 244 Madison Ave, Suite # 405, 10016, New York, New York, U.S.A., +1 7183015977, without undue delay and in any event not later than 14 days from the day on which you communicate your cancellation from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of cancellation
The right of cancellation does not apply to:
Model withdrawal form
(complete and return this form only if you wish to withdraw from the contract)
To: (Books Puddle, 244 Madison Ave, Suite # 405, 10016, New York, New York, U.S.A., +1 7183015977)
I/We (*) hereby give notice that I/We (*) withdraw from my/our (*) contract of sale of the following goods (*)/for the provision of the following goods (*)/for the provision of the following service (*),
Ordered on (*)/received on (*)
Name of consumer(s)
Address of consumer(s)
Signature of consumer(s) (only if this form is notified on paper)
Date
* Delete as appropriate.
| Order quantity | 12 to 19 business days | 12 to 14 business days |
|---|---|---|
| First item | £ 2.98 | £ 5.22 |
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.