Advances in Transportation Systems and Pavement Engineering: Challenges and Solutions - Vol 3
New - Hardcover
Condition: New
Ships from Germany to U.S.A.
Quantity: Over 20 available
Add to basketCondition: New
Quantity: Over 20 available
Add to basketDieser Artikel ist ein Print on Demand Artikel und wird nach Ihrer Bestellung fuer Sie gedruckt.
Seller Inventory # 2926019132
This book presents selected proceedings from the 11th International Conference on Transportation Systems Engineering and Management (CTSEM 2025), offering insights into the latest advancements in transportation planning, traffic engineering, and sustainable infrastructure. It covers key topics such as urban and regional transportation planning, public and mass transit systems, and the application of ML and AI in traffic management and transportation systems. This book also explores innovations in pavement materials, design, and construction, emphasizing sustainable practices and the use of recycled and alternative materials. Further, it addresses critical aspects of road safety, traffic flow modeling, and the evaluation, rehabilitation, and maintenance of transportation infrastructure. Special focus is given to the environmental impact of transportation project, including air and noise pollution, and lifecycle assessments. Contributions from experts offer practical solutions for enhancing infrastructure resilience and efficiency, especially in the context of helping countries like India. This book serves as a comprehensive reference for professionals, researchers, and policymakers working to shape the future of transportation systems.
Dr. Bivina G. R. is an Assistant Professor in Civil Engineering at Maulana Azad National Institute of Technology Bhopal (MANIT), specializing in Transportation Engineering. She received her Ph.D. from Indian Institute of Technology Roorkee, focusing on pedestrian level of service assessment. She completed her M.Tech. from Visvesvaraya National Institute of Technology Nagpur and B.Tech. from University of Kerala.She has published 20+ journal papers and presented 40+ conference papers. She serves on the Editorial Board of Transportation Research Part F: Psychology and Behaviour and reviews for leading journals. Her work, supported by agencies such as SERB, INAE, and ICSSR, focuses on pedestrian safety, traffic flow modeling, and sustainable urban transportation systems.
Dr. Pritikana Das is an assistant professor in the Department of Civil Engineering at Maulana Azad National Institute of Technology Bhopal, with a specialization in Transportation Engineering. She completed her Ph.D. from the Indian Institute of Technology Roorkee. Her thesis titled Development of Macroscopic Flow Modeling for Pedestrians’ and Level of Service. Dr. Pritikana has done Master of Technology in Transportation Engineering from Maulana Azad National Institute of Technology Bhopal and a Bachelor of Technology in Civil Engineering from National Institute of Technology Durgapur. Her research interests lie in pedestrian behavior and safety, sustainable urban transport, and traffic engineering. She has been actively involved in various academic projects and has published numerous research papers in reputed journals. Dr. Pritikana worked 3 years as a scientist C in CSIR-CRRI New Delhi in Transport Planning Division from March 2017 to March 2020.
Dr. K. Krishnamurthy is presently a professor in the Department of Civil Engineering, National Institute of Technology, Calicut, India. He graduated in Civil Engineering from Bharathiyar University, Coimbatore, in 1993, and obtained post-graduate degree in Urban Engineering from Anna University, Chennai, in 1996. He completed his doctoral degree in Transportation Engineering from Indian Institute of Technology, Madras. He has over 25 years of experience in teaching and research in Traffic and Transportation Engineering. The areas of academic and research interest include Traffic flow modeling, Road safety analysis, non-motorized transport, Transport economic analysis and Environmental impact assessment of transport, etc. Besides teaching, he has guided several post-graduate students, research scholars and published over 75 research and technical papers at various conferences and in national and international journals.
Dr. Samson Mathew completed his B.Tech. Degree from University of Kerala, in the year 1985, M.Tech. Degree from University of Calicut in 1988 and Ph.D. from University of Calicut in 1996. He joined National Institute of Technology (formerly Regional Engineering College), Tiruchirappalli in the year 1994. Dr. Samson Mathew is currently working as the professor of Civil Engineering at National Institute of Technology, Tiruchirappalli. He also heads the Centre of Excellence in Transportation Engineering (CETransE) at NIT Tiruchirappalli. He is a member of State Technical Agency of Prime Minister Gram Sadak Yojana program for Tamil Nadu and Pondicherry. Formerly, Dr. Samson Mathew was the Dean (Students Welfare) at NIT, Tiruchirappalli. He was the convener of Hostels and chief warden. He was the chief of Works for three years at NITT and played an instrumental role in developing the infrastructure of the campus.
"About this title" may belong to another edition of this title.
Instructions for revocation/
Standard Business Terms and customer information/ data protection declaration
Revocation right for consumers
(A ?consumer? is any natural person who concludes a legal transaction which, to an overwhelming extent, cannot be attributed to either his commercial or independent professional activities.)
Instructions for revocation
Revocation right
You have the right to revoke this contract within one month without specifying any reasons.
The revocation period is one month...
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to moluna, Greven, Germany, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
II. Kundeninformationen
Moluna GmbH
Engberdingdamm 27
48268 Greven
Deutschland
Telefon: 02571/5698933
E-Mail: abe@moluna.de
Wir sind nicht bereit und nicht verpflichtet, an Streitbeilegungsverfahren vor Verbraucherschlichtungsstellen teilzunehmen.
Die technischen Schritte zum Vertragsschluss, der Vertragsschluss selbst und die Korrekturmöglichkeiten erfolgen nach Maßgabe der Regelungen "Zustandekommen des Vertrages" unserer Allgemeinen Geschäftsbedingungen (Teil I.).
3.1. Vertragssprache ist deutsch .
3.2. Der vollständige Vertragstext wird von uns nicht gespeichert. Vor Absenden der Bestellung können die Vertragsdaten über die Druckfunktion des Browsers ausgedruckt oder elektronisch gesichert werden. Nach Zugang der Bestellung bei uns werden die Bestelldaten, die gesetzlich vorgeschriebenen Informationen bei Fernabsatzverträgen und die Allgemeinen Geschäftsbedingungen nochmals per E-Mail an Sie übersandt.
Die wesentlichen Merkmale der Ware und/oder Dienstleistung finden sich im jeweiligen Angebot.
5.1. Die in den jeweiligen Angeboten angeführten Preise sowie die Versandkosten stellen Gesamtpreise dar. Sie beinhalten alle Preisbestandteile einschließlich aller anfallenden Steuern.
5.2. Die anfallenden Versandkosten sind nicht im Kaufpreis enthalten. Sie sind über eine entsprechend bezeichnete Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot aufrufbar, werden im Laufe des Bestellvorganges gesondert ausgewiesen und sind von Ihnen zusätzlich zu tragen, soweit nicht die versandkostenfreie Lieferung zugesagt ist.
5.3. Die Ihnen zur Verfügung stehenden Zahlungsarten sind unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot ausgewiesen.
5.4. Soweit bei den einzelnen Zahlungsarten nicht anders angegeben, sind die Zahlungsansprüche aus dem geschlossenen Vertrag sofort zur Zahlung fällig.
6.1. Die Lieferbedingungen, der Liefertermin sowie gegebenenfalls bestehende Lieferbeschränkungen finden sich unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot.
Soweit im jeweiligen Angebot oder unter der entsprechend bezeichneten Schaltfläche keine andere Frist angegeben ist, erfolgt die Lieferung der Ware innerhalb von 3-5 Tagen nach Vertragsschluss (bei vereinbarter Vorauszahlung jedoch erst nach dem Zeitpunkt Ihrer Zahlungsanweisung).
6.2. Soweit Sie Verbraucher sind ist gesetzlich geregelt, dass die Gefahr des zufälligen Untergangs und der zufälligen Verschlechterung der verkauften Sache während der Versendung erst mit der Übergabe der Ware an Sie übergeht, unabhängig davon, ob die Versendung versichert oder unversichert erfolgt. Dies gilt nicht, wenn Sie eigenständig ein nicht vom Unternehmer benanntes Transportunternehmen oder eine sonst zur Ausführung der Versendung bestimmte Person beauftragt haben.
Sind Sie Unternehmer, erfolgt die Lieferung und Versendung auf Ihre Gefahr.
Die Mängelhaftung richtet sich nach der Regelung "Gewährleistung" in unseren Allgemeinen Geschäftsbedingungen (Teil I).
letzte Aktualisierung: 23.10.2019
| Order quantity | 16 to 45 business days | 16 to 45 business days |
|---|---|---|
| First item | £ 41.80 | £ 41.80 |
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.