Advances in Sulfide Smelting : Volume 1 - Basic Principles; Volume 2 - Technology and Practice. Proceedings of the 1983 International Sulfide Smelting Symposium and the 1983 Extractive and Process Metallurgy Meeting of the Metallurgical Society of AIME held in San Francisco, California, November 6-9, 1983 and sponsored by the Physical Chemistry Committee, the Pyrometallurgy Committee, and the Economics Committee of the Metallurgical Society of AIME, and the joint Environemental Control Committee of the Metallurgical Society and the Society of Mining Engineers of AIME.
Published by Conference Proceedings, The Metallurgical Society of AIME, Pennsylvania, 1983.
- Used



Seller: City Basement Books, Melbourne, VIC, AustraliaCity Basement Books
AbeBooks seller since December 5, 2000
Condition: Used
£ 65.11
Quantity: 1 available
Add to basketItem description from seller
8vo, hardback, xvi + xiii + 1143pp (Vol 1: xvi + 393pp; Vol 2: xiii + 750pp). Good condition in good- dustwrappers (unclipped, sunned spines, Vol 1 has long closed tear at upper left with marks from a now-gone sticker at upper right, lower spine edge chipped and creased, small closed tear at upper right rear; Vol 2 has small triangualr piece missing from lower front edge, a few open and closed tears, chipped and cresaed edges; both volumes have small rectangular marks at lower spine where stickers have been removed). Bumped, general light wear, page edges a little age-toned. This item is heavy and may attract additional postage. Pictures available on request.
Seller Inventory # 77292
Bibliographic details
- Title
- Advances in Sulfide Smelting : Volume 1 - Basic Principles; Volume 2 - Technology and Practice. Proceedings of the 1983 International Sulfide Smelting Symposium and the 1983 Extractive and Process Metallurgy Meeting of the Metallurgical Society of AIME held in San Francisco, California, November 6-9, 1983 and sponsored by the Physical Chemistry Committee, the Pyrometallurgy Committee, and the Economics Committee of the Metallurgical Society of AIME, and the joint Environemental Control Committee of the Metallurgical Society and the Society of Mining Engineers of AIME.
- Author
- Sohn, H.Y. & George, D.B. & Zunkel, A.D. (eds)
- Publisher
- Conference Proceedings, The Metallurgical Society of AIME, Pennsylvania, 1983.
City Basement Books
Melbourne, VIC, Australia
AbeBooks seller since December 5, 2000
Shipping rates from Australia to U.S.A.
| Item | 5 to 30 business days | 5 to 14 business days |
|---|---|---|
| First item | £ 18.10 | £ 24.89 |
Payment methods
- Bank Wire Transfer
- Paypal
Specialty
GeneralSeller's business information
City Basement Books
342 Flinders Street
Melbourne, VIC Australia 3000
Terms of sale
Shipping supplied at cost. Insurance available if desired.
Right of withdrawal
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to City Basement Books, Melbourne, Victoria, Australia, +61 (03) 9620 0428, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
- The delivery of newspapers, journals or magazines with the exception of subscription contracts; and
- The supply of digital content which is not supplied on a tangible medium (e.g. on a CD or DVD) if you accepted when you placed your order that we could start to deliver it, and that you could not withdraw once delivery had started.
Shipping terms
Shipping costs are based on an 'average' sized book, and we will adjust ABE's postage estimate up or down according to the actual cost involved.