Advances in Structural Integrity and Failure
Sold by AHA-BUCH GmbH, Einbeck, Germany
AbeBooks Seller since 14 August 2006
New - Hardcover
Condition: New
Ships from Germany to U.S.A.
Quantity: 1 available
Add to basketSold by AHA-BUCH GmbH, Einbeck, Germany
AbeBooks Seller since 14 August 2006
Condition: New
Quantity: 1 available
Add to basketnach der Bestellung gedruckt Neuware - Printed after ordering - The purpose of this book is to expand the knowledge and skills of civil and structural engineers and researchers and help them better understand, design, and analyze civil engineering applications. This book examines advancements in structural integrity and failure and underground construction. It offers profound insights into the mechanisms that can lead to the integrity or failure of structures and result in safe underground construction. It provides details on the fundamental principles, theories, behavior, and performance of different structural elements and underground construction. The book delves into the mechanics, design, and construction of reinforced concrete structures. It explores the design principles applied to reinforced concrete structures and considers critical structural elements like beams, slabs, columns, and foundations. It also demonstrates various advances in reinforced concrete technology, including high-performance concrete, fiber-reinforced concrete, self-compacting concrete, and the use of nanomaterials. It describes methods for the analysis and evaluation of reinforced concrete structures, non-destructive testing methods, structural health monitoring, finite element analysis, and causes of failure. In addition, the book proposes a design model for determining the flexural bearing capacity of reinforced concrete beams having reinforcement steel with reduced modulus of elasticity. Moreover, the book investigates the effects of loading rates on the mechanical properties of structural steel. It also evaluates the formation of welding defects in the process of connecting steel structures, which is inevitable, from the aspect of failure mechanics. In addition, it utilizes an equivalent shell-wire model to propose a simple accurate technique for nonlinear assessment of reinforced concrete shear walls with less computational cost. The book introduces tunnel design theory and method, support structure systems, construction technology, and equipment under complex geological conditions. Furthermore, it highlights procedures to design efficient dewatering systems considering the working conditions, stability, and impacts generated in the vicinity of construction, and to examine the state of retaining walls by using hydrogeological tools. Finally, it outlines the online monitoring and intelligent diagnosis mechanism of key equipment in the subway ventilation system.
Seller Inventory # 9781837695539
"About this title" may belong to another edition of this title.
General Terms and Conditions and Customer Information / Privacy Policy
I. General Terms and Conditions
§ 1 Basic provisions
(1) The following terms and conditions apply to all contracts that you conclude with us as a provider (AHA-BUCH GmbH) via the Internet platforms AbeBooks and/or ZVAB. Unless otherwise agreed, the inclusion of any of your own terms and conditions used by you will be objected to
(2) A consumer within the meaning of the following regulations is any natural person who concludes...
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to AHA-BUCH GmbH, Einbeck, Germany, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
We ship your order after we received them
for articles on hand latest 24 hours,
for articles with overnight supply latest 48 hours.
In case we need to order an article from our supplier our dispatch time depends on the reception date of the articles, but the articles will be shipped on the same day.
Our goal is to send the ordered articles in the fastest, but also most efficient and secure way to our customers.
| Order quantity | 30 to 40 business days | 7 to 14 business days |
|---|---|---|
| First item | £ 53.85 | £ 62.41 |
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.