Advances in Production Management Systems
Matthias Thürer, Ralph Riedel, Gregor von Cieminski, David Romero
Used - Hardcover
Condition: Used - Near fine
Ships from Spain to U.S.A.
Quantity: 1 available
Add to basketCondition: Used - Near fine
Quantity: 1 available
Add to basket: Este libro, titulado 'Advances in Production Management Systems', es una publicación académica que explora los sistemas de gestión de producción en entornos volátiles, inciertos, complejos y ambiguos. Presenta las actas de la 43ª Conferencia Internacional IFIP WG 5.7, celebrada en Chemnitz, Alemania, del 8 al 12 de septiembre de 2024. El libro se organiza en seis volúmenes que abarcan un amplio espectro de investigaciones sobre la gestión de la producción, incluyendo prácticas ecoeficientes, cadenas de suministro sostenibles, la integración de la inteligencia artificial y la transformación digital en la industria. EAN: 9783031716362 Tipo: Libros Categoría: Tecnología Título: Advances in Production Management Systems Autor: Matthias Thürer| Ralph Riedel| Gregor von Cieminski| David Romero Editorial: Springer-Verlag GmbH Idioma: en Páginas: 518 Formato: tapa dura.
Seller Inventory # Happ-2025-10-24-b9411dc2
The six-volume set IFIP AICT 728-729 constitutes the refereed proceedings of the 43rd IFIP WG 5.7 International Conference on Advances in Production Management Systems, APMS 2024, held in Chemnitz, Germany, during September 8–12, 2024.
The 201 full papers presented together were carefully reviewed and selected from 224 submissions. The APMS 2024 conference proceedings are organized into six volumes, covering a large spectrum of research addressing the overall topic of the conference “Production Management Systems for Volatile, Uncertain, Complex, and Ambiguous Environments”.
Part I: advancing eco-efficient and circular industrial practices; barriers and challenges for transition towards circular and sustainable production processes and servitized business models; implementing the EU green deal: challenges and solutions for a sustainable supply chain; risk analysis and sustainability in an uncertain system in a digital era.
Part II: smart and sustainable supply chain management in the society 5.0 era; human-centred manufacturing and logistics systems design and management for the operator 5.0; inclusive work systems design: applying technology to accommodate individual workers’ needs; evolving workforce skills and competencies for industry 5.0; experiential learning in engineering education.
Part III: lean thinking models for operational excellence and sustainability in the industry 4.0 era; human in command – operator 4.0/5.0 in the age of AI and robotic systems; hybrid intelligence – decision-making for AI-enabled industry 5.0; mechanism design for smart and sustainable supply chains.
Part IV: digital transformation approaches in production and management; new horizons for intelligent manufacturing systems with IoT, AI, and digital twins.
Part V: smart manufacturing assets as drivers for the twin transition towards green and digital business; engineering and managing AI for advances in asset lifecycle and maintenance management; transforming engineer-to-Order projects, supply chains, and systems in turbulent times; methods and tools to achieve the digital and sustainable servitization of manufacturing companies; open knowledge networks for smart manufacturing; applications of artificial intelligence in manufacturing; intralogistics.
Part VI: modelling supply chain and production systems; resilience management in supply chains; digital twin concepts in production and services; optimization; additive manufacturing; advances in production management systems.
"About this title" may belong to another edition of this title.
Payment by credit card or PayPal.
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to Hamelyn, Madrid, Madrid, Spain, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
All shipments will have tracking number, however, free shipments will not provide tracking information.
Urgent shipment to any point of peninsular Spain with guaranteed delivery in 24/48 working hours.
Shipping to autonomous cities, Canary Islands and Balearic Islands with delivery in 2-7 working days.
Shipments to Europe with delivery in 2-10 working days.
Shipments outside Europe with delivery in 5-20 working days.
| Order quantity | 4 to 14 business days | 1 to 3 business days |
|---|---|---|
| First item | £ 11.10 | £ 15.37 |
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.