Advances in Mechanical Engineering and Material Sciences
Sold by Books Puddle, New York, NY, U.S.A.
AbeBooks Seller since 22 November 2018
New - Soft cover
Condition: New
Ships within U.S.A.
Quantity: 4 available
Add to basketSold by Books Puddle, New York, NY, U.S.A.
AbeBooks Seller since 22 November 2018
Condition: New
Quantity: 4 available
Add to basketThe International Conference on Advances in Mechanical Engineering and Material Sciences (ICAMEMS-2025) was organized by the Department of Mechanical Engineering, Department of Physics and Department of Chemistry, Vidyavardhaka College of Engineering, Mysuru from 10th to 11th March 2025 at Department of Mechanical Engineering, Vidyavardhaka College of Engineering, Mysuru. ICAMEMS 2025 served as a multidisciplinary platform for researchers, academicians, industry experts, and students to present and discuss the latest innovations, challenges, and opportunities in the fields of mechanical engineering and material sciences. The conference aimed to promote collaboration and knowledge exchange by covering a wide range of topics including thermal and fluid engineering, manufacturing technologies, industrial design, quality engineering, advanced materials, engineering chemistry, and applied physics.
Dr. Vinay K B
is Professor and Head of Mechanical Engineering at VVCE, Mysuru. With 15 years of academic experience, he holds B.E., M.Tech., and Ph.D. degrees in Mechanical Engineering. His research interests include heat transfer, fluid flow, quality management, entrepreneurship, incubation, and engineering systems design.
Dr. S. A. Mohankrishna
is an Associate Professor in the Department of Mechanical Engineering at Vidyavardhaka College of Engineering (VVCE), Mysuru. With expertise in thermal engineering and renewable energy systems, he has contributed significantly through research publications, academic mentorship, and active involvement in professional and institutional development initiatives.
Dr. J. Paulo Davim
is a distinguished professor at the University of Aveiro, Portugal, with over 35 years of experience in manufacturing, materials, and mechanical engineering. He leads the MACTRIB research group, serves as editor for several international journals, and is recognized among the world’s top 2% scientists.
Dr. Om Prakash Singh
is a Professor at IIT (BHU) Varanasi, with prior experience at IIT Mandi and TVS Motors. A Ph.D. from IISc Bangalore in CFD, he has led projects funded by SERB, DRDO, and BRNS, holds multiple patents, and has published extensively in reputed journals.
"About this title" may belong to another edition of this title.
We accept return for those books which are received damamged. Though we take appropriate care in packaing to avoid such situation.
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to Books Puddle, New York, New York, U.S.A., without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
| Order quantity | 12 to 19 business days | 12 to 14 business days |
|---|---|---|
| First item | £ 2.95 | £ 5.16 |
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.