Advances in Material Science and Engineering
Sold by Basi6 International, Irving, TX, U.S.A.
AbeBooks Seller since 24 June 2016
New - Soft cover
Condition: New
Ships within U.S.A.
Quantity: 10 available
Add to basketSold by Basi6 International, Irving, TX, U.S.A.
AbeBooks Seller since 24 June 2016
Condition: New
Quantity: 10 available
Add to basketNew. Delivery takes 25-30 days. Excellent Customer Service.
Seller Inventory # POD-369353
This book presents the latest research advancements in the field of material science, specifically in mechanical, manufacturing, and plant engineering. It includes peer reviewed articles from the 9th International Conference on Mechanical, Manufacturing and Plant Engineering (ICMMPE 2023) held on 16th November 2023 at The Everly Hotel Putrajaya, Malaysia. The conference showcases cutting-edge research and facilitates knowledge exchange among experts in the field of material science, mechanical engineering and their applications.
Dr. Sattar S. Emamian is an accomplished individual with a strong academic background and extensive expertise in the field of Mechanical Engineering. He earned his Doctorate degree in Mechanical Engineering from Universiti Teknologi PETRONAS (UTP), Malaysia in 2018. As a recognized professional, he is a member of the esteemed Board of Engineers Malaysia (BEM). Following the completion of his doctoral studies, he furthered his research career as a post-doctoral research fellow at the University of Malaya in 2019. His research focuses on various areas, including manufacturing systems, friction stir welding, solid-state additive manufacturing, and materials science. These research endeavors have expanded the knowledge and understanding of these subjects, contributing to the advancement of the field. Currently, he is a researcher at the University of Twente, where he continues to explore new horizons in his areas of expertise.
Dr. Mokhtar Awang is a Professional Engineer and an Associate Professor at Universiti Teknologi PETRONAS (UTP), Perak, Malaysia. He is also a Chartered Engineer with Institute of Marine Engineering, Science and Technology, UK (IMarEST). He obtained his Bachelor Degree in Mechanical Engineering from University of Detroit Mercy, MI, USA, and both Master and Doctorate degrees from West Virginia University, WV, USA. Mokhtar Awang had 6 years of experience in industry and over 20 years of academic experience in the field of finite element modeling and friction stir welding. Currently he serves as a Director at Institute of Transport Infrastructure at UTP.
Dr. Hussain H. Al-Kayiem obtained his PhD from the University of Bradford-UK. His research interests are in the areas of Thermo-Fluids and Energy Technologies leader.Prof Hussain has been awarded at different national and international levels for his innovative achievements in the energy sector. He wasawarded the Special Energy and Environment INNOVA2010 award – Brussels; and a special award from the Polish Inventor and Rationalized Institute in 2011. For his distinguished academic achievements, Prof. Hussain has conferred the ‘Eminent Scientist Award’ of Wessex Institute – the UK in 2016. And for his distinguished scientific contributions, he has been appointed as a research fellow of Wessex Institute of Technology-UK, a research fellow of the Center of Excellence for Advanced Research in Fluid Flow, CARIFF-UMP, and a research fellow in the Power Generation Research Centre, PGRC - UNITEN. He is an editor and editorial board member of three international journals and the Engineering Journal – UTP platform editor.
"About this title" may belong to another edition of this title.
Professional Book Seller shipping from Multiple Locations Worldwide for fastest delivery possible!
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to Basi6 International, Irving, Texas, U.S.A., without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
All orders shipped via FedEx or DHL and delivered to your doorstep within 3-5 days. We do not ship to P.O.Boxes and a proper street address must be provided to avoid any delays.
| Order quantity | 5 to 14 business days | 3 to 6 business days |
|---|---|---|
| First item | £ 0.00 | £ 0.00 |
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.