Advances in Information Systems Development
Sold by Basi6 International, Irving, TX, U.S.A.
AbeBooks Seller since 24 June 2016
New - Soft cover
Condition: New
Ships within U.S.A.
Quantity: 10 available
Add to basketSold by Basi6 International, Irving, TX, U.S.A.
AbeBooks Seller since 24 June 2016
Condition: New
Quantity: 10 available
Add to basketNew. US edition. Print on demand title. Delivery takes 20-25 days.
Seller Inventory # POD-310310
This volume features a collection of papers on emerging concepts, significant insights, novel approaches and ideas in information systems development (ISD). It examines and investigates up-and-coming trends in ISD in general, emphasizing the continuous collaboration between developers and operators to optimize the software delivery time. The book gathers selected papers from the 29th International Conference on Information Systems Development held at Universitat Politècnica de València, Spain, September 8-10, 2021.
The theme of ISD2021 was “Crossing Boundaries between Development and Operations (DevOps) in Information Systems.” The revised and extended papers focus on the influences among information systems, organizational structures, processes and people from its conception to its operation. They examine methodological issues and ways in which the IS designers, developers and operators are transforming organisations and society through information systems.
Emilio Insfran Pelozo is an Associate Professor in the Department of Information Systems and Computation (DISC) at the Universitat Politècnica de València (Spain). His research interests are cloud service architectures, DevOps, model-driven development, requirements engineering, and software quality.
Fernando González-Ladrón-de-Guevara is an Associate Professor in the Department of Business Organisation at the Universitat Politècnica de València (Spain). His research interests lie in the realm of development and implementation of Information Systems in organizational contexts.
Silvia Abrahão is an Associate Professor in the Department of Computer Science at the Universitat Politècnica de València (Spain). Her main areas of expertise are quality assurance in model-driven engineering, empirical assessment of software modeling approaches and the integration of usability in system development.
Marta Fernández-Diego is an Assistant Professor in the Department of Business Organisation at the Universitat Politècnica de València (Spain), where she teaches in the School of Informatics. Her research interests include business analytics, project risk management, empirical software engineering, and software effort estimation.
Chris Barry works with the Cairnes School of Business and Economics at the National University of Ireland, Galway. He lectures and researches a range of areas in Information Systems including systems analysis and design, information systems management, and ethics in information systems development.
Michael Lang is a Senior Lecturer in Business Information Systems at the Cairnes School of Business and Economics, National University of Ireland, Galway. His research interests are business systems analysis and design, information systems privacy, and information systems education.
Henry Linger is an Associate Professor in the Faculty of Information Technology and a senior researcher withthe Centre for Organisational and Social Informatics (COSI) at Monash University in Melbourne, Australia. His research is at the intersection of information systems, knowledge management, and project management, with a focus on the design of information systems to support knowledge work.
Christoph Schneider is an Assistant Professor in the Information Systems Department at IESE Business School. His research focuses on the effects of user interface design on cognition, affect, and behavior, in particular in the context of web-based user interfaces.
"About this title" may belong to another edition of this title.
Professional Book Seller shipping from Multiple Locations Worldwide for fastest delivery possible!
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to Basi6 International, Irving, Texas, U.S.A., without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
All orders shipped via FedEx or DHL and delivered to your doorstep within 3-5 days. We do not ship to P.O.Boxes and a proper street address must be provided to avoid any delays.
| Order quantity | 5 to 14 business days | 3 to 6 business days |
|---|---|---|
| First item | £ 0.00 | £ 0.00 |
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.