Advances in Engineering Management, Innovation, an
Sold by Basi6 International, Irving, TX, U.S.A.
AbeBooks Seller since 24 June 2016
New - Hardcover
Condition: New
Ships within U.S.A.
Quantity: 10 available
Add to basketSold by Basi6 International, Irving, TX, U.S.A.
AbeBooks Seller since 24 June 2016
Condition: New
Quantity: 10 available
Add to basketNew. Delivery takes 25-30 days. Excellent Customer Service.
Seller Inventory # POD-375559
This book contains a selection of papers from the 13th International Conference on Engineering, Project, and Production Management (EPPM) held in Auckland, New Zealand from 29 November to 1 December 2023. The conference was organized by the School of Built Environment, Massey University in collaboration with the EPPM Association. The book comprises of quality-assured theoretical discussions, data analysis, case studies, and industry practices, presented by global researchers and practitioners. The conference theme was “Creating capacity and capability: re-energizing supply chain for sustainable management of projects and productions in engineering,” and this volume focuses on papers related to engineering management, innovation, and sustainability. The papers are comprehensive, multidisciplinary, and advanced, and will be of interest to researchers and practitioners from various industries seeking the latest updates on the fields of engineering, project, and production management.
Prof James Rotimi is a Professor of Construction Economics and Management at the School of Built Environment, Massey University, New Zealand. He is also a visiting Professor in the School of Construction Economics and Management, University of the Witwatersrand, Johannesburg, South Africa. James has qualifications in building construction management, civil engineering, commerce, and education. He is a Fellow of the Chartered Institute of Building UK and holds professional membership of the Royal Institution of Chartered Surveyors, UK, New Zealand Institute of Building, Facilities Management Association of New Zealand, and the Nigerian Institute of Building (NIOB). James' research has focused on improving performance within the construction industry, integrating its supply chain, and optimizing the achievement of construction and project deliverables. He has over 30 years of tertiary teaching and research experience in academic institutions in Nigeria, UK, South Africa, and New Zealand. He also has various building construction industry experiences, including a senior associate role in a quantity surveying consultancy in Nigeria. James publishes extensively within peer-reviewed journals and conference proceedings and in edited books. He is the Founding Editor of the International Journal of Construction Supply Chain Management IJCSCM, established in 2011.
Dr Wajiha Shahzad is a highly experienced academic with over 15 years of academic and construction industry experience. Currently, a Senior Lecturer in Construction Management and Postgraduate Lead at the School of Built Environment, Massey University in New Zealand, her expertise includes construction management, productivity, and modern methods of construction, with a specific focus on offsite construction. She leads a research group on ‘Future Material Technologies in Built Environment’. Her research has been recognised for its impact and novel contributions to the field of offsiteconstruction. She has published various quality-assured journal papers, conference papers, book chapters, and industry reports. Her work has played a significant role in shaping policies surrounding the advancement of the construction industry in New Zealand.
Prof Monty Sutrisna is Professor of Construction and Project Management and is the Head of the School of the School of Built Environment at Massey University, New Zealand. He is the current President of the Australasian Universities Building Education Association (AUBEA) and a current member of the Board of the International Council for Research and Innovation in Building and Construction (CIB). His research expertise includes Construction and Engineering Management, Construction Productivity, Construction Procurement and Contracts, Construction IT and other Advanced Technologies applied in Construction including Offsite Construction, Decision Making Modelling/Support, Knowledge Based Systems and Artificial Intelligence. Prior to joining Massey University, he was the Head of Construction Management Department at Curtin University in Western Australia and he was the Director of PG Research Training & Outreach as well as the Programme Director for Construction Management Programme at the University of Salford, UK.
Dr Ravindu Kahandawa is a Lecturer in Quantity Surveying at The School of Built Environment at Massey University with 8 years of experience in the construction industry and academia. Ravindu graduated with a BSc (Hons) In Quantity Surveying from the University of Moratuwa, Sri Lanka, and Completed my Ph.D. at Massey University, New Zealand In the area of "Cost Estimation model for Earthquake Damage Repair Work". Ravindu is also the lead researcher in a NZD 200,000, BRANZ (Building Research Association of New Zealand)-funded project titled, “Construction cost blowouts – can a standardized opensource cost estimation process help?", and a key researcher in another BRANZ-funded project on Zeron carbon. Ravindu's research areas include construction waste, circular economy, and construction company insolvencies.
"About this title" may belong to another edition of this title.
Professional Book Seller shipping from Multiple Locations Worldwide for fastest delivery possible!
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to Basi6 International, Irving, Texas, U.S.A., without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
All orders shipped via FedEx or DHL and delivered to your doorstep within 3-5 days. We do not ship to P.O.Boxes and a proper street address must be provided to avoid any delays.
| Order quantity | 5 to 14 business days | 3 to 6 business days |
|---|---|---|
| First item | £ 0.00 | £ 0.00 |
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.