Advances in Construction Management
Language: English
Published by Springer, Berlin|Springer Nature Singapore|Springer, 2021
Series: Book 193 of 362 - Lecture Notes in Civil Engineering
- Hardcover
- New

Condition: New
£ 299.53
Quantity: Over 20 available
Add to basketItem description from seller
Dieser Artikel ist ein Print on Demand Artikel und wird nach Ihrer Bestellung fuer Sie gedruckt. Various topics covered include architecture and urban planning, smart materials and structures, GIS in construction application, transportation materials and engineering, geotechnical applications in construction, energy and sustainability, green building t.
Seller Inventory # 492762366
- Title
- Advances in Construction Management
- Publisher
- Springer, Berlin|Springer Nature Singapore|Springer
- Publication year
- 2021
- Condition
- New
- Binding
- Gebunden
- Language
- English
- ISBN 10
- 9811658382
- ISBN 13
- 9789811658389
- Series
- Book 193 of 362: Lecture Notes in Civil Engineering
This book presents the select proceedings of the International Conference on Advances in Construction Materials and Management (ACMM 2021). It discusses the recent innovations towards construction management, building technology and new materials in practice in civil engineering. Various topics covered include architecture and urban planning, smart materials and structures, GIS in construction application, transportation materials and engineering, geotechnical applications in construction, energy and sustainability, green building technologies and materials and construction management. The book will be useful for beginners, researchers and professionals working in the area of civil engineering.
"Synopsis" may belong to another edition of this title.
About the Author
Dr Lee Yee Loon is currently working as a Professor at University Tun Hussein Onn Malaysia (UTHM). Dr Lee has completed his PhD in Civil Engineering from University Technology Malaysia (2000). His major areas of research interest are Biomass aggregate concrete, Controlled density geopolymer concrete for pontoon, road on soft soil and peat, Pervious concrete, Engineered stone column, Fastening system for IBS, NDT, Structural appraisal and health monitoring and Engineering management beyond critical path. He is also a member of Professional Associations are FCSM (Past President, Concrete Society of Malaysia, 2008-2010), MACRI (Life member of Malaysia Association of Creativity & Innovation) and MBIC (Board member of Malaysia Biomass Industries Confederation)
Dr Muthulingam Subramaniyan is working as Assistant Professor in Indian Institute of Technology Ropar, Rupnagar. He obtained BE in Civil Engineering from National Institute of Technology Trichy 2002, M.Tech inStructural Engineering from Indian Institute of Technology Delhi, 2005 and PhD in Structural Engineering from Indian Institute of Technology Madras, 2014. His major areas of research interest are advanced design of steel and concrete structures, Reliability and risk assessment of new and existing infrastructure systems, Stochastic finite element analysis, Stochastic deterioration modelling of RC structures, Spatio-temporal structural reliability, Progressive collapse analysis of structures and Probabilistic risk analysis of structures exposed to blast loading.
Dr K Gunasekaran is currently working as Professor at SRM Institute of Science and Technology (formerly known as SRM University), Kattankulathur campus. He has obtained DCE in Civil from Directorate of Technical Education 1988, DCT in Concrete Technology from Annamalai University 1990, AMIE in Civil Engineering from The Institution of Engineers (India) 1992, M.E in Structural Engineeringfrom Anna University, 2004 and PhD in Structural Engineering from SRM Institute of Science and Technology, 2011. His major areas of research interest are Lightweight concrete, Coconut shell concrete, High strength concrete, Self-compacting concrete and Steel-concrete-steel double skin elements. He has published more than 46 papers in peer reviewed international journals.
"About the title" may belong to another edition of this title.
Shipping rates from Germany to U.S.A.
| Item | 26 to 60 business days | 26 to 60 business days |
|---|---|---|
| First item | £ 42.14 | £ 42.14 |
Payment methods
- Bank Wire Transfer
- Check
- Paypal
Store description
Online Handel nur mit Neubüchern
Seller's business information
Moluna GmbH
Engberdingdamm 27
Greven, Germany 48268
Terms of sale
About Us
Legal website operator identification:
Moluna GmbH
Represented by the general manager Helge Blischke
Engberdingdamm 27
48268 Greven
Germany
Telephone: 02571/5698933
Telefax: 02571/5698930
E-Mail: abe@moluna.de
VAT No.: DE296281834
listed in the commercial register of the local court Steinfurt
Commercial register number - Part B of the commercial register - 10553
We are a member of the initiative „FairCommerce“ since 24.07.2015.
For more information, see: www.haendlerbund.de/faircommerce.
Right of withdrawal
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to moluna, Greven, Germany, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
- The delivery of newspapers, journals or magazines with the exception of subscription contracts; and
- The supply of digital content which is not supplied on a tangible medium (e.g. on a CD or DVD) if you accepted when you placed your order that we could start to deliver it, and that you could not withdraw once delivery had started.