Advances in Civil Engineering Materials
Mokhtar Awang
Sold by Books-by-Floh, Paderborn, Germany
AbeBooks Seller since 13 March 2026
New - Soft cover
Condition: New
Ships from Germany to U.S.A.
Quantity: 2 available
Add to basketSold by Books-by-Floh, Paderborn, Germany
AbeBooks Seller since 13 March 2026
Condition: New
Quantity: 2 available
Add to basketNeuware -This book showcases the latest research in civil engineering and architectural materials, with a specific focus on the following key areas: circularity, energy retrofitting, building materials, structural advancements, and transportation innovations. The research findings and advancements presented in this book are a part of the 7th International Conference on Architecture and Civil Engineering (ICACE 2023), held on 15 November 2023 at the Everly Hotel Putrajaya, Malaysia. This conference serves as a prominent platform for researchers, professionals, and industry experts to exchange knowledge and ideas in order to advance the fields of civil engineering and architecture. 1106 pp. Englisch.
Seller Inventory # 9789819707539
This book showcases the latest research in civil engineering and architectural materials, with a specific focus on the following key areas: circularity, energy retrofitting, building materials, structural advancements, and transportation innovations. The research findings and advancements presented in this book are a part of the 7th International Conference on Architecture and Civil Engineering (ICACE 2023), held on 15 November 2023 at the Everly Hotel Putrajaya, Malaysia. This conference serves as a prominent platform for researchers, professionals, and industry experts to exchange knowledge and ideas in order to advance the fields of civil engineering and architecture.
Dr. Elham Maghsoudi Nia obtained her Ph.D. degree in “Civil Engineering” from Universiti Teknologi PETRONAS in 2019. She obtained her master’s degree from Universiti Putra Malaysia in “Architectural Studies”. Her study during Ph.D. and M.Sc. was focused on environmental issues and harvesting of renewable energies in urban context. She joined the TU Delft, Faculty of Architecture, in 2021 and started her research on “Energy Transition”. Currently, she is working on “Facilitating circularity in the construction sector”. Her interest is promoting sustainable and energy efficiency technologies and approaches in the buildings.
Dr. Mokhtar Awang is a professional engineer and an associate professor at Universiti Teknologi PETRONAS, Perak, Malaysia. He is also a chartered engineer at the Institute of Marine Engineering, Science and Technology, UK (IMarEST). He obtained his bachelor’s degree in Mechanical Engineering from University of Detroit Mercy, MI,USA, and both master’s and doctorate degrees from West Virginia University, WV, USA. Mokhtar Awang had 6 years of experience in industry and over 19 years of academic experience in the field of finite element modeling and friction stir welding."About this title" may belong to another edition of this title.
General Terms and Conditions
Table of Contents
1. Scope
These General Terms and Conditions (GTC) apply to all orders placed via the Abebooks or ZAVB website by consumers and entrepreneur...
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to Books-by-Floh, Paderborn, Germany, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
| Order quantity | 60 to 60 business days | 60 to 60 business days |
|---|---|---|
| First item | £ 90.04 | £ 111.48 |
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.