Advanced Materials for Sustainable Developments
ACerS
Sold by Books Puddle, New York, NY, U.S.A.
AbeBooks Seller since 22 November 2018
New - Hardcover
Condition: New
Ships within U.S.A.
Quantity: 3 available
Add to basketSold by Books Puddle, New York, NY, U.S.A.
AbeBooks Seller since 22 November 2018
Condition: New
Quantity: 3 available
Add to basketpp. x + 139 1st Edition.
Seller Inventory # 261452031
Contributions from three symposia that were part of the 34th International Conference on Advanced Ceramics and Composites (ICACC), inDaytona Beach,FL, January 24-29, 2010 are presented in this volume. The broad range of topics is captured by the symposia titles, which are listed as follows: International Symposium on Ceramics for Electric Energy Generation, Storage, and Distribution (debuted in 2010); Thermal Management Materials and Technologies (debuted in 2010); and lastly, and Advanced Sensor Technology, Developments and Applications (debuted in 2010). These new symposia emerged during this ICACC meeting due to community growth and interest, and thus each of these subject areas were established as stand-alone symposia.
The current volume represents 15 contributions from the above listed symposia that embody the latest developments in engineering ceramics for energy technologies, thermal management utilizing either highly conductive or insulating materials, as well as advances regarding the utilization of ceramics for sensors.
Dr. Hua-Tay Lin, Distinguished R&D staff member, Group Lead of Ceramic Science and Technology Group, Materials Science and Technology Division, Oak Ridge National Laboratory, is currently focusing researches on mechanical reliability of ceramic components and electronic devices, high-temperature mechanical performance of ceramics and composites, high-temperature steam effects on mechanical reliability of ceramics and environmental barrier coating systems, and engineering of microstructure and properties of ceramics and composites, and coatings. He has served as a PI on numerous programs sponsored by DOE's Office of Distributed Energy, Office of Electricity Distribution Reliability and Transmission, Office of Transportation Technologies, Office of Industrial Technologies, and Office of Power Technologies with frequent collaborations with researchers at institution in the U. S., Japan, Korea, and Europe. Dr. Lin is the pass Chair of the Engineering Ceramics Division of the American Ceramic Society. He currently serves as the Editor-in-Chief of the International Journal of Applied Ceramic Technology. He is a Fellow of The American Ceramic Society. Dr. Lin holds a M.S. and a Ph.D. in Materials Engineering from Auburn University, Auburn, Alabama, and a B.S. in Physics from National Central University, Taiwan.
"About this title" may belong to another edition of this title.
We accept return for those books which are received damamged. Though we take appropriate care in packaing to avoid such situation.
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to Books Puddle, New York, New York, U.S.A., without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
| Order quantity | 12 to 19 business days | 12 to 14 business days |
|---|---|---|
| First item | £ 3.02 | £ 5.28 |
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.