Accessories for HV and EHV Extruded Cables
Book 10 of 10: CIGRE Green BooksSold by Basi6 International, Irving, TX, U.S.A.
AbeBooks Seller since 24 June 2016
New - Hardcover
Condition: New
Ships within U.S.A.
Quantity: 10 available
Add to basketSold by Basi6 International, Irving, TX, U.S.A.
AbeBooks Seller since 24 June 2016
Condition: New
Quantity: 10 available
Add to basketNew. Delivery takes 20-25 days. Print on Demand.
Seller Inventory # POD-349965
This CIGRE Green book on accessories for HV and EHV extruded cables covers relevant issues in cable system design, cable design, and submarine cables, including offshore generation connection. It provides comprehensive and unbiased information, essential recommendations and guidelines for design, installation, testing and maintenance of accessories to professionals through the exceptional expertise of the authors.
The publication is divided in two volumes covering land and submarine applications, HVAC and HVDC systems, andtransitions from lapped cable systems to extruded cable systems, from OHL to UG cables and from cables to substations. It equips the reader with recommendations for testing, installation, maintenance, and remaining life management. This volume is dedicated to Land and Submarine AC/DC Applications while Volume 1 deals with Components.The book compiles the results of the work achieved by several Working Groups and Task Forces of CIGRE Study Committee 21/B1, and Joint Working Groups and Joint Task Forces with other Study Committees. Many experts from Study Committees 21/B1 (Insulated Cables), 15/D1 (Materials and Emerging Test Techniques), 33/B3 (Substations), C3 (System Environmental Performance), and C4 (System Technical Performance) have participated in this work in the last 30 years in order to offer comprehensive, continuous, and consistent outputs.
The Study Committee B1 of CIGRE (Insulated Cables) covers underground and submarine, AC and DC, Insulated Cable Systems. SC B1 (formerly SC 21) was established in 1927 and celebrated its 80th anniversary during the 2007 Study Committee meeting in Osaka (Japan).
Pierre Argaut graduated as an Electrical Engineer from the “Institut d’Electrotechnique de Grenoble” in 1971. He joined Delle-Alsthom (Now part of Alstom Grid) in Nov 1971 and took several positions before heading the R&D Department on GIS. After being Operation Manager of South European Pipeline, he joined SILEC in 1988 and retired at the end of 2010. His last position with SILEC was Senior Vice President. In Study Committee B1 (Insulated Cables) Pierre has held position of Working Group Member (21.09;21.06;21.07;21.17), French SC Member, Working Group Convener (B1.19), Special Reporter (2010), Advisory Group Convener (Tutorial Advisory Group till 2010) and is currently Chairman of SC B1 since 2010. He received the Technical Committee Award in 2000 and Distinguished Member Award in 2002.
"About this title" may belong to another edition of this title.
Professional Book Seller shipping from Multiple Locations Worldwide for fastest delivery possible!
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to Basi6 International, Irving, Texas, U.S.A., without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
All orders shipped via FedEx or DHL and delivered to your doorstep within 3-5 days. We do not ship to P.O.Boxes and a proper street address must be provided to avoid any delays.
| Order quantity | 5 to 14 business days | 3 to 6 business days |
|---|---|---|
| First item | £ 0.00 | £ 0.00 |
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.