Accelerator-Driven System at Kyoto University Critical Assembly
Language: English
Published by Springer Singapore, 2021
- Hardcover
- New

Seller: moluna, Greven, Germanymoluna
AbeBooks seller since July 9, 2020
Condition: New
£ 42.72
Quantity: Over 20 available
Add to basketItem description from seller
Dieser Artikel ist ein Print on Demand Artikel und wird nach Ihrer Bestellung fuer Sie gedruckt. This book is open access, which means that you have free and unlimited accessAllows for easy access to all results of real ADS experimentsProvides useful references for measurement methodologies and calculation modeling for ADSVerifi.
Seller Inventory # 440126699
- Title
- Accelerator-Driven System at Kyoto University Critical Assembly
- Publisher
- Springer Singapore
- Publication year
- 2021
- Condition
- New
- Binding
- Hardcover
- Language
- English
- ISBN 10
- 981160343X
- ISBN 13
- 9789811603433
This open access book is a unique compilation of experimental benchmark analyses of the accelerator-driven system (ADS) at the Kyoto University Critical Assembly (KUCA) on the most recent advances in the development of computational methods. It is devoted especially to nuclear engineers and scientists. Readers will find a detailed description of advanced measurement techniques and calculation methodologies for the ADS with 14 MeV neutrons and high-energy neutrons (with combined use of 100 MeV protons and Pb-Bi target) at KUCA. Additionally, experimental results of nuclear transmutation of minor actinides by ADS and at a critical state are included. Readers also have access to benchmarks of specific ADS experiments with raw data in the Appendix. The book is a valuable resource for the ADS experiments at KUCA which are globally recognized as both static and kinetic studies from the point of view of fundamental research.
"Synopsis" may belong to another edition of this title.
About the Author
Cheol Ho Pyeon is an associate professor at the Institute for Integral Radiation and Nuclear Science, Kyoto University, Japan. He received his Ph.D. from the Department of Fundamental Energy Science, Kyoto University. He joined the Research Reactor Institute of Kyoto University as an assistant professor in 2002 and was appointed to his current position in 2012. He contributes to the Journal of Nuclear Science and Technology (JNST), published by the Atomic Energy Society of Japan, as the vice editor-in-chief. He was honored with the JNST Most-Cited Article Award in 2014 and 2015.
"About the title" may belong to another edition of this title.
Shipping rates from Germany to U.S.A.
| Item | 26 to 60 business days | 26 to 60 business days |
|---|---|---|
| First item | £ 42.01 | £ 42.01 |
Payment methods
- Bank Wire Transfer
- Check
- Paypal
Store description
Online Handel nur mit Neubüchern
Seller's business information
Moluna GmbH
Engberdingdamm 27
Greven, Germany 48268
Terms of sale
About Us
Legal website operator identification:
Moluna GmbH
Represented by the general manager Helge Blischke
Engberdingdamm 27
48268 Greven
Germany
Telephone: 02571/5698933
Telefax: 02571/5698930
E-Mail: abe@moluna.de
VAT No.: DE296281834
listed in the commercial register of the local court Steinfurt
Commercial register number - Part B of the commercial register - 10553
We are a member of the initiative „FairCommerce“ since 24.07.2015.
For more information, see: www.haendlerbund.de/faircommerce.
Right of withdrawal
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to moluna, Greven, Germany, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
- The delivery of newspapers, journals or magazines with the exception of subscription contracts; and
- The supply of digital content which is not supplied on a tangible medium (e.g. on a CD or DVD) if you accepted when you placed your order that we could start to deliver it, and that you could not withdraw once delivery had started.