ACMSM25
Language: English
Published by Springer Singapore, 2020
- Softcover
- New

Condition: New
£ 164.78
Quantity: Over 20 available
Add to basketItem description from seller
Dieser Artikel ist ein Print on Demand Artikel und wird nach Ihrer Bestellung fuer Sie gedruckt. Presents articles from The Australasian Conference on the Mechanics of Structures and Materials (ACMSM25 held in Brisbane, December 2018)Highlights recent findings in the area of structural mechanics, civil engineering and materialsBri.
Seller Inventory # 449938548
- Title
- ACMSM25
- Publisher
- Springer Singapore
- Publication year
- 2020
- Condition
- New
- Binding
- Soft cover
- Language
- English
- ISBN 10
- 9811376050
- ISBN 13
- 9789811376054
- Series
- Book 45 of 362: Lecture Notes in Civil Engineering
This book presents articles from The Australasian Conference on the Mechanics of Structures and Materials (ACMSM25 held in Brisbane, December 2018), celebrating the 50th anniversary of the conference. First held in Sydney in 1967, it is one of the longest running conferences of its kind, taking place every 2–3 years in Australia or New Zealand. Bringing together international experts and leaders to disseminate recent research findings in the fields of structural mechanics, civil engineering and materials, it offers a forum for participants from around the world to review, discuss and present the latest developments in the broad discipline of mechanics and materials in civil engineering.
"Synopsis" may belong to another edition of this title.
About the Author
Professor CM Wang is the TMR Chair Professor in Structural Engineering, The University of Queensland. He is a Chartered Structural Engineer, a Fellow of the Institution of Engineers Singapore, a Fellow of Academy of Engineering Singapore, a Fellow of the Institution of Structural Engineers and a Fellow of the Society of Floating Solutions (Singapore). His research interests are in the areas of structural stability, vibration, optimization, plated structures and Mega‐Floats. He has published over 420 journal papers and coauthored 9 books such as Very Large Floating Structures, Structural Vibration, Shear Deformable Beams and Plates: Relationships with Classical Solutions and Exact Solutions for Buckling of Structural Members. He is an Editor‐in‐Chief of the International Journal of Structural Stability and Dynamics and an Editorial Board Member in several journals including of Engineering Structures, International Journal of Applied Mechanics, and Ocean Systems Engineering. He has won many awards that include the IStructE Singapore Structural Awards 2016, Keith Eaton Award, Lewis Kent Award, IES Prestigious Engineering Achievement Award, and the Grand Prize of the Next Generation Container Port Challenge.
Dr JCM Ho is the Senior Lecturer of The University of Queensland in the School of Civil Engineering. His research interests are on concrete-filled-steel-tube columns and rheology of concrete, mortar and cement paste.
Professor S Kitipornchai is from the School of Civil Engineering at the University of Queensland, Australia. He is a Fellow of the Australian Academy of Technological Sciences and Engineering (ATSE) and a Fellow of the European Academy of Sciences and Arts (EASA). He has been Honorary Professors at Tongji University and at Beijing Jiatong University. He is the Regional Editor of Engineering Structures journal since 1993. His research interests are in the areas of structural stability, steel structures, transmission towers, computational mechanics, advanced composite and smart materials. He has published over 345 journal papers, and 8 books, with a web of science h-index of 55 and over 10,000 citations.
He has been with the University of Queensland since 1976. From 2001 to 2012, he worked at the City University of Hong Kong and was Head of Department for 6 years, during which time he established the discipline of Civil Engineering and the Department of Architecture and Civil Engineering for City University of Hong Kong. He has won many awards that include the Munro Prize, the University of Queensland Teaching Excellence Award, and the Monash Civil Engineering Alumnus of the Year Award. Recently he was awarded the Nishino Medal from the EASEC Conference.
"About the title" may belong to another edition of this title.
Shipping rates from Germany to U.S.A.
| Item | 16 to 45 business days | 16 to 45 business days |
|---|---|---|
| First item | £ 40.87 | £ 40.87 |
Payment methods
- Bank Wire Transfer
- Check
- Paypal
Store description
Online Handel nur mit Neubüchern
Seller's business information
Moluna GmbH
Engberdingdamm 27
Greven, Germany 48268
Terms of sale
About Us
Legal website operator identification:
Moluna GmbH
Represented by the general manager Helge Blischke
Engberdingdamm 27
48268 Greven
Germany
Telephone: 02571/5698933
Telefax: 02571/5698930
E-Mail: abe@moluna.de
VAT No.: DE296281834
listed in the commercial register of the local court Steinfurt
Commercial register number - Part B of the commercial register - 10553
We are a member of the initiative „FairCommerce“ since 24.07.2015.
For more information, see: www.haendlerbund.de/faircommerce.
Right of withdrawal
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to moluna, Greven, Germany, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
- The delivery of newspapers, journals or magazines with the exception of subscription contracts; and
- The supply of digital content which is not supplied on a tangible medium (e.g. on a CD or DVD) if you accepted when you placed your order that we could start to deliver it, and that you could not withdraw once delivery had started.