9787122144287 Power Plant practical techniques Reading Series - thermal instrumentation and automatic control systems(Chinese Edition)
Language: Chinese
Published by Chemical Industry Press, 2000
- Softcover
- New

Condition: New
£ 49.50
- Bank Wire Transfer
- Paypal
Quantity: 1 available
Add to basketItem description from seller
Ship out in 2 business day, And Fast shipping, Free Tracking number will be provided after the shipment.Paperback. Pub Date :2012-09-01 Pages: 234 Publisher: Chemical Industry Press title: power plant utility Reading Series - thermal instrumentation and automatic control system Original Price: 48.00 yuan: Zhou Shanlong editor Tan Xingjiang deputy editor Publisher: Chemical Industry Press Publication Date :2012-9-1ISBN: 9787122144287 Words: Pages: 234 Edition: 1 Binding: Paperback: 16 Weight: Editor's Summary This book describes a thermal power plant thermal measurement basic principles of instrumentation and automatic control and protection equipment constructed knowledge and operation and maintenance and fault analysis method. and introduces a new instrumentation and control technology and equipment. The contents include: the principle of common instrument of the basics of thermal measurement. temperature. pressure. flow. level. speed and mechanical quantity surveying. structural. Maintenance and Troubleshooting knowledge with the knowledge of other common online analytical instruments. CEMS thermal autoregulation sequence control. PLC. DCS and DEH system equipment. hardware and software constitute logical principle. operation and maintenance and troubleshooting basic knowledge. Book primarily for power plant thermal engineering management personnel and equipment maintenance personnel training to learn to use. can also be used as a thermal mechanical professional operation and management personnel to understand the thermal expertise Readings. but also as a large colleges students learning materials. Directory Chapter 1 thermal measurement instrumentation 1.1 basic concepts 1.1.2 Thermal Measurement Basics 1.1.1 measurement and measuring instruments measurement and units of measurement of temperature measuring instruments 1.1.3 measurement error 1.2 1.2.1 Overview 1.2.2 thermoelectric 1.3.3 elastic even 1.2.3 Thermal Resistance 1.3 pressure measuring instruments 1.3.1 Overview 1.3.2 liquid column manometer pressure sensor manometer 1.3.4 1.3.5 Pressure measuring instruments common fault handling the 1.4 flow measurement instrumentation 1.4.1 differential pressure flowmeter 1.4.2 Electromagnetic Flowmeter Rotameter 1.4.4 1.4.3 other principles flowmeter 1.5 power plant level measurement instrumentation of other commonly used measuring instruments 1.5.1 1.5.2 1.5.3 displacement speed measurement expansion and vibration measuring 1.6 analysis the instrument 1.6.1 zirconia oxygen measurement instrumentation 1.6.2 Conductivity measurements 1.6.3pH meter 1.6.4 turbidimeter monitoring sub-1.7 Continuous Emission Monitoring System 1.7.1 particulate matter (soot) Chapter 2 Thermal to subsystem 1.7.4CEMS calibration and fault handling automatic control and protection of 2.1 Thermal System 1.7.2 gaseous pollutant monitoring subsystem 1.7.3 flue gas emissions parameter measurement automatically control 2.1.1 automatic control basics 2.1 .2 actuator device 2.1.3 power plants typical automatic control system 2.2 Sequence Control System 2.2.1 Overview 2.2.2 boiler flue gas system order control 2.2.3 The water supply system the sequence control 2.2.4 furnace safety supervisory system 2.3DEH system 2.3. 2.4.1 Overview 2.4.2 2.3.3 speed and load control valve system constitute 2.3.2DEH 1DEH run way to manage a 2.3.4DEH the protection and other functions 2.3.5DEH 2.3.6DEH common faults and processing 2.4 programmable control system Examples of the programmable controller programmable controller hardware structure 2.4.3 works 2.4.4 programmable controller network 2.4.5 programmable controller applications 2.5 Distributed Control System 2.5.1 Overview 2.5.2DCS system application example humanized design 2.5.3DCS system debugging with the operation and maintenance of the preamble to the failure analysis 2.5.4DCS system references the Author AbstractsFour Satisfaction guaranteed,or money back. …
Seller Inventory # FT076711
- Title
- 9787122144287 Power Plant practical techniques Reading Series - thermal instrumentation and automatic control systems(Chinese Edition)
- Author
- ZHOU SHAN LONG ZHU BIAN TAN XING QIANG FU ZHU BIAN
- Publisher
- Chemical Industry Press
- Publication year
- 2000
- Condition
- New
- Binding
- paperback
- Language
- Chinese
- ISBN 10
- 7122144283
- ISBN 13
- 9787122144287
"Synopsis" may belong to another edition of this title.
Shipping rates from China to U.S.A.
| Item | 16 to 30 business days | 8 to 16 business days |
|---|---|---|
| First item | £ 13.60 | £ 22.67 |
Store description
Thank you for visiting My bookstore! We are an online bookstore, and Is the China's largest online book sales. Generally our books are from China, with reasonable price and decent printing quality. We are always trying our best to satisfy customer's needs!
Specialty
Chemistry, Mathematics, Computer, Physics, Environment, Social SciencesSeller's business information
NAN JING SHI JIANG NING QU NING YUAN DIAN ZI SHANG WU ZHONG XIN
Room 264, Oujiang Shopping Center, No. 1 Dongxin South Road, Dongshan Street, Jiangning District, NanJing
Nanjing, JS China 211100
Terms of sale
We guarantee the condition of every book as it's described on the Abebooks web sites. If you're dissatisfied with your purchase (Incorrect Book/Not as Described/Damaged) or if the order hasn't arrived, you're eligible for a refund within 30 days of the estimated delivery date. If you've changed your mind about a book that you've ordered, please use the Ask bookseller a question link to contact us and we'll respond within 2 business days. Please Note:We don't sell any international Edition to you. Don't send any question about international Edition to us.
Right of withdrawal
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to liu xing, Nanjing, JS, China, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
- The delivery of newspapers, journals or magazines with the exception of subscription contracts; and
- The supply of digital content which is not supplied on a tangible medium (e.g. on a CD or DVD) if you accepted when you placed your order that we could start to deliver it, and that you could not withdraw once delivery had started.
Shipping terms
Most orders are shipped within 24 hours. We will delivery these items to you by SAL, EUB, EMS, FEDEX etc.