£ 9.51 shipping from Germany to United Kingdom
Destination, rates & speedsSeller: BuchWeltWeit Ludwig Meier e.K., Bergisch Gladbach, Germany
Taschenbuch. Condition: Neu. This item is printed on demand - it takes 3-4 days longer - Neuware -The main objective of this book is to provide basic explanations about drawing a project-based network diagrams and to estimate the project completion duration and cost in particular. Thus, this book has been well structured to explore the bases and basics of network analyses in relation to activity time and cost. In Chapter 1, the introduction for drawing a project network is explained with the limitations and rules applied for. Chapter 2 explains the determination of activity and project based time (duration), respective probability and floating possibility; and Chapter 3 consists of critical path analyses. Considering the activity duration and cost, the book introduces three conceptualised perspectives for a project in the rest of the chapters (4, 5 and 6), respectively: Normal duration and normal cost, Minimum duration and its associated cost, and Minimum Cost and its associated duration; and this book counts the credits on the conceptualisation. 108 pp. Englisch. Seller Inventory # 9786206784142
Quantity: 2 available
Seller: moluna, Greven, Germany
Condition: New. Dieser Artikel ist ein Print on Demand Artikel und wird nach Ihrer Bestellung fuer Sie gedruckt. The main objective of this book is to provide basic explanations about drawing a project-based network diagrams and to estimate the project completion duration and cost in particular. Thus, this book has been well structured to explore the bases and basics . Seller Inventory # 1167115487
Quantity: Over 20 available
Seller: AHA-BUCH GmbH, Einbeck, Germany
Taschenbuch. Condition: Neu. nach der Bestellung gedruckt Neuware - Printed after ordering - The main objective of this book is to provide basic explanations about drawing a project-based network diagrams and to estimate the project completion duration and cost in particular. Thus, this book has been well structured to explore the bases and basics of network analyses in relation to activity time and cost. In Chapter 1, the introduction for drawing a project network is explained with the limitations and rules applied for. Chapter 2 explains the determination of activity and project based time (duration), respective probability and floating possibility; and Chapter 3 consists of critical path analyses. Considering the activity duration and cost, the book introduces three conceptualised perspectives for a project in the rest of the chapters (4, 5 and 6), respectively: Normal duration and normal cost, Minimum duration and its associated cost, and Minimum Cost and its associated duration; and this book counts the credits on the conceptualisation. Seller Inventory # 9786206784142
Quantity: 1 available
Seller: buchversandmimpf2000, Emtmannsberg, BAYE, Germany
Taschenbuch. Condition: Neu. Neuware -The main objective of this book is to provide basic explanations about drawing a project-based network diagrams and to estimate the project completion duration and cost in particular. Thus, this book has been well structured to explore the bases and basics of network analyses in relation to activity time and cost. In Chapter 1, the introduction for drawing a project network is explained with the limitations and rules applied for. Chapter 2 explains the determination of activity and project based time (duration), respective probability and floating possibility; and Chapter 3 consists of critical path analyses. Considering the activity duration and cost, the book introduces three conceptualised perspectives for a project in the rest of the chapters (4, 5 and 6), respectively: Normal duration and normal cost, Minimum duration and its associated cost, and Minimum Cost and its associated duration; and this book counts the credits on the conceptualisation.Books on Demand GmbH, Überseering 33, 22297 Hamburg 108 pp. Englisch. Seller Inventory # 9786206784142
Quantity: 2 available