Items related to Heuristic Methods for Job Shop Scheduling: Active,...

Heuristic Methods for Job Shop Scheduling: Active, non-delay and heuristic schedule generation algorithm - Softcover

 
9786204206752: Heuristic Methods for Job Shop Scheduling: Active, non-delay and heuristic schedule generation algorithm

Synopsis

As a result, there are still some schedules that are not precise, causing a large make-span. In observations made on 5 products, the company requires a total production time (make-span) of 11 hours 54 minutes in completing production activities. In this research, scheduling evaluation is conducted to minimize make-span using the Active Schedule Generation algorithm, Non-delay Schedule Generation and Heuristic Schedule Generation Algorithm The approach used is to use a quantitative-comparative approach, namely research that compiles the calculation process to make comparisons between the results of the actual process with these methods. Therefore, the Heuristic Schedule Generation algorithm method was chosen as the best method and can be applied in the company to minimize the make-span.

"synopsis" may belong to another edition of this title.

Buy New

View this item

£ 20.03 shipping from Germany to U.S.A.

Destination, rates & speeds

Other Popular Editions of the Same Title

9786204208473: Heuristic Methods for Job Shop Scheduling: Active, Non-delay and Heuristic Schedule Generation Algorithm

Featured Edition

ISBN 10:  6204208470 ISBN 13:  9786204208473
Publisher: LAP LAMBERT Academic Publishing, 2021
Softcover

Search results for Heuristic Methods for Job Shop Scheduling: Active,...

Seller Image

Muhammad Arul Zaini
ISBN 10: 6204206753 ISBN 13: 9786204206752
New Taschenbuch
Print on Demand

Seller: BuchWeltWeit Ludwig Meier e.K., Bergisch Gladbach, Germany

Seller rating 5 out of 5 stars 5-star rating, Learn more about seller ratings

Taschenbuch. Condition: Neu. This item is printed on demand - it takes 3-4 days longer - Neuware -As a result, there are still some schedules that are not precise, causing a large make-span. In observations made on 5 products, the company requires a total production time (make-span) of 11 hours 54 minutes in completing production activities. In this research, scheduling evaluation is conducted to minimize make-span using the Active Schedule Generation algorithm, Non-delay Schedule Generation and Heuristic Schedule Generation Algorithm The approach used is to use a quantitative-comparative approach, namely research that compiles the calculation process to make comparisons between the results of the actual process with these methods. Therefore, the Heuristic Schedule Generation algorithm method was chosen as the best method and can be applied in the company to minimize the make-span. 88 pp. Englisch. Seller Inventory # 9786204206752

Contact seller

Buy New

£ 35.80
Convert currency
Shipping: £ 20.03
From Germany to U.S.A.
Destination, rates & speeds

Quantity: 2 available

Add to basket

Seller Image

Muhammad Arul Zaini
Published by LAP LAMBERT Academic Publishing, 2021
ISBN 10: 6204206753 ISBN 13: 9786204206752
New Softcover
Print on Demand

Seller: moluna, Greven, Germany

Seller rating 4 out of 5 stars 4-star rating, Learn more about seller ratings

Condition: New. Dieser Artikel ist ein Print on Demand Artikel und wird nach Ihrer Bestellung fuer Sie gedruckt. Autor/Autorin: Zaini Muhammad ArulMy name is Muhammad Arul Zaini, I was born on 9th September 1996 in Indonesia. Since a child I was educated and living far from my parents until I graduated and got a master s degree in engineering. I have dedicate. Seller Inventory # 519630314

Contact seller

Buy New

£ 30.73
Convert currency
Shipping: £ 42.67
From Germany to U.S.A.
Destination, rates & speeds

Quantity: Over 20 available

Add to basket

Seller Image

Muhammad Arul Zaini
ISBN 10: 6204206753 ISBN 13: 9786204206752
New Taschenbuch

Seller: buchversandmimpf2000, Emtmannsberg, BAYE, Germany

Seller rating 5 out of 5 stars 5-star rating, Learn more about seller ratings

Taschenbuch. Condition: Neu. Neuware -As a result, there are still some schedules that are not precise, causing a large make-span. In observations made on 5 products, the company requires a total production time (make-span) of 11 hours 54 minutes in completing production activities. In this research, scheduling evaluation is conducted to minimize make-span using the Active Schedule Generation algorithm, Non-delay Schedule Generation and Heuristic Schedule Generation Algorithm The approach used is to use a quantitative-comparative approach, namely research that compiles the calculation process to make comparisons between the results of the actual process with these methods. Therefore, the Heuristic Schedule Generation algorithm method was chosen as the best method and can be applied in the company to minimize the make-span.Books on Demand GmbH, Überseering 33, 22297 Hamburg 88 pp. Englisch. Seller Inventory # 9786204206752

Contact seller

Buy New

£ 35.80
Convert currency
Shipping: £ 52.26
From Germany to U.S.A.
Destination, rates & speeds

Quantity: 2 available

Add to basket

Seller Image

Muhammad Arul Zaini
Published by LAP LAMBERT Academic Publishing, 2021
ISBN 10: 6204206753 ISBN 13: 9786204206752
New Taschenbuch
Print on Demand

Seller: AHA-BUCH GmbH, Einbeck, Germany

Seller rating 5 out of 5 stars 5-star rating, Learn more about seller ratings

Taschenbuch. Condition: Neu. nach der Bestellung gedruckt Neuware - Printed after ordering - As a result, there are still some schedules that are not precise, causing a large make-span. In observations made on 5 products, the company requires a total production time (make-span) of 11 hours 54 minutes in completing production activities. In this research, scheduling evaluation is conducted to minimize make-span using the Active Schedule Generation algorithm, Non-delay Schedule Generation and Heuristic Schedule Generation Algorithm The approach used is to use a quantitative-comparative approach, namely research that compiles the calculation process to make comparisons between the results of the actual process with these methods. Therefore, the Heuristic Schedule Generation algorithm method was chosen as the best method and can be applied in the company to minimize the make-span. Seller Inventory # 9786204206752

Contact seller

Buy New

£ 36.69
Convert currency
Shipping: £ 52.91
From Germany to U.S.A.
Destination, rates & speeds

Quantity: 1 available

Add to basket