Effective project management in building construction always related to three major items that is time implication, cost implication and quality of the building construction. This book identified four most important causes to the ineffectiveness of project management in building construction which are design error, construction error, client change requirement and other factor which are mostly related to authority change requirement and no risk management implication. To achieve an effective project management in building construction , for primary stage, there are four main reasons need to be solved and PDCA ( Plan-Do-Check-Act) method have been proposed to help solve three major process of building construction that is pre-construction period, construction period and post-construction period.
"synopsis" may belong to another edition of this title.
Dr. Norzima Zulkifli before joining the academic institution, has 18 years of experience in consulting and giving training to the small and medium industries in Malaysia. She has conducted and supervised many researches related to industrial engineering, quality management; and has published journals and articles based on the findings.
"About this title" may belong to another edition of this title.
Seller: BuchWeltWeit Ludwig Meier e.K., Bergisch Gladbach, Germany
Taschenbuch. Condition: Neu. This item is printed on demand - it takes 3-4 days longer - Neuware -Effective project management in building construction always related to three major items that is time implication, cost implication and quality of the building construction. This book identified four most important causes to the ineffectiveness of project management in building construction which are design error, construction error, client change requirement and other factor which are mostly related to authority change requirement and no risk management implication. To achieve an effective project management in building construction , for primary stage, there are four main reasons need to be solved and PDCA ( Plan-Do-Check-Act) method have been proposed to help solve three major process of building construction that is pre-construction period, construction period and post-construction period. 76 pp. Englisch. Seller Inventory # 9783846591192
Seller: Books Puddle, New York, NY, U.S.A.
Condition: New. Seller Inventory # 26358624345
Seller: Majestic Books, Hounslow, United Kingdom
Condition: New. Print on Demand. Seller Inventory # 353866630
Quantity: 4 available
Seller: Biblios, Frankfurt am main, HESSE, Germany
Condition: New. PRINT ON DEMAND. Seller Inventory # 18358624339
Seller: moluna, Greven, Germany
Condition: New. Dieser Artikel ist ein Print on Demand Artikel und wird nach Ihrer Bestellung fuer Sie gedruckt. Autor/Autorin: Zulkifli NorzimaDr. Norzima Zulkifli before joining the academic institution, has 18 years of experience in consulting and giving training to the small and medium industries in Malaysia. She has conducted and supervised many research. Seller Inventory # 5501749
Quantity: Over 20 available
Seller: Revaluation Books, Exeter, United Kingdom
Paperback. Condition: Brand New. 76 pages. 8.66x5.91x0.18 inches. In Stock. Seller Inventory # 384659119X
Quantity: 1 available
Seller: buchversandmimpf2000, Emtmannsberg, BAYE, Germany
Taschenbuch. Condition: Neu. This item is printed on demand - Print on Demand Titel. Neuware -Effective project management in building construction always related to three major items that is time implication, cost implication and quality of the building construction. This book identified four most important causes to the ineffectiveness of project management in building construction which are design error, construction error, client change requirement and other factor which are mostly related to authority change requirement and no risk management implication. To achieve an effective project management in building construction , for primary stage, there are four main reasons need to be solved and PDCA ( Plan-Do-Check-Act) method have been proposed to help solve three major process of building construction that is pre-construction period, construction period and post-construction period.VDM Verlag, Dudweiler Landstraße 99, 66123 Saarbrücken 76 pp. Englisch. Seller Inventory # 9783846591192
Seller: AHA-BUCH GmbH, Einbeck, Germany
Taschenbuch. Condition: Neu. nach der Bestellung gedruckt Neuware - Printed after ordering - Effective project management in building construction always related to three major items that is time implication, cost implication and quality of the building construction. This book identified four most important causes to the ineffectiveness of project management in building construction which are design error, construction error, client change requirement and other factor which are mostly related to authority change requirement and no risk management implication. To achieve an effective project management in building construction , for primary stage, there are four main reasons need to be solved and PDCA ( Plan-Do-Check-Act) method have been proposed to help solve three major process of building construction that is pre-construction period, construction period and post-construction period. Seller Inventory # 9783846591192
Seller: preigu, Osnabrück, Germany
Taschenbuch. Condition: Neu. Effective Project Management | In building construction | Norzima Zulkifli (u. a.) | Taschenbuch | 76 S. | Englisch | 2011 | LAP LAMBERT Academic Publishing | EAN 9783846591192 | Verantwortliche Person für die EU: BoD - Books on Demand, In de Tarpen 42, 22848 Norderstedt, info[at]bod[dot]de | Anbieter: preigu. Seller Inventory # 106719154
Seller: Mispah books, Redhill, SURRE, United Kingdom
paperback. Condition: New. NEW. SHIPS FROM MULTIPLE LOCATIONS. book. Seller Inventory # ERICA829384659119X6