Seller: BuchWeltWeit Ludwig Meier e.K., Bergisch Gladbach, Germany
Taschenbuch. Condition: Neu. This item is printed on demand - it takes 3-4 days longer - Neuware -Almost all Addis Ababa city road projects are exposed to time and cost overrun. Failure of roads also starts before the expected design period expires. The objective of this research is to identify the factors adversely affecting the objectives of AACRA road projects and to propose recommendation on how to deal with the problems. To achieve the objectives of the research, case study of 10 road projects selected from Addis Ababa, desk studies relevant to the subject matter and 10 interview responses from professionals from the client, consultants and contractors that have been currently working with AACRA have been rigorously assessed. The findings from the research show that the major problem for non-achieving project objectives of AACRA roads is the slow clearance of obstructions from ROW construction limit. There is no formal risk management entertained by any of the parties to address the issue. This book also introduces a Project Definition Rating Index (PDRI) tool which is believed by the researcher helpful to assess scope definition completeness at various stages of AACRA road preproject planning process. 232 pp. Englisch. Seller Inventory # 9783659964671
Seller: moluna, Greven, Germany
Condition: New. Dieser Artikel ist ein Print on Demand Artikel und wird nach Ihrer Bestellung fuer Sie gedruckt. Autor/Autorin: Tegabu TemesgenTemesgen Tegabu, BSc, M.Sc: Studied Civil Engineering at Addis Ababa University, Ethiopia. Presently Claim Expert at DOHWA-IPE-MCE JV Consulting Engr. for Industrial Park Construction Projects in A.A. Also Fdr & GM at . Seller Inventory # 255955837
Quantity: Over 20 available
Seller: Books Puddle, New York, NY, U.S.A.
Condition: New. Seller Inventory # 26394748421
Seller: Majestic Books, Hounslow, United Kingdom
Condition: New. Print on Demand. Seller Inventory # 401661402
Quantity: 4 available
Seller: Biblios, Frankfurt am main, HESSE, Germany
Condition: New. PRINT ON DEMAND. Seller Inventory # 18394748431
Seller: AHA-BUCH GmbH, Einbeck, Germany
Taschenbuch. Condition: Neu. nach der Bestellung gedruckt Neuware - Printed after ordering - Almost all Addis Ababa city road projects are exposed to time and cost overrun. Failure of roads also starts before the expected design period expires. The objective of this research is to identify the factors adversely affecting the objectives of AACRA road projects and to propose recommendation on how to deal with the problems. To achieve the objectives of the research, case study of 10 road projects selected from Addis Ababa, desk studies relevant to the subject matter and 10 interview responses from professionals from the client, consultants and contractors that have been currently working with AACRA have been rigorously assessed. The findings from the research show that the major problem for non-achieving project objectives of AACRA roads is the slow clearance of obstructions from ROW construction limit. There is no formal risk management entertained by any of the parties to address the issue. This book also introduces a Project Definition Rating Index (PDRI) tool which is believed by the researcher helpful to assess scope definition completeness at various stages of AACRA road preproject planning process. Seller Inventory # 9783659964671
Seller: buchversandmimpf2000, Emtmannsberg, BAYE, Germany
Taschenbuch. Condition: Neu. This item is printed on demand - Print on Demand Titel. Neuware -Almost all Addis Ababa city road projects are exposed to time and cost overrun. Failure of roads also starts before the expected design period expires. The objective of this research is to identify the factors adversely affecting the objectives of AACRA road projects and to propose recommendation on how to deal with the problems. To achieve the objectives of the research, case study of 10 road projects selected from Addis Ababa, desk studies relevant to the subject matter and 10 interview responses from professionals from the client, consultants and contractors that have been currently working with AACRA have been rigorously assessed. The findings from the research show that the major problem for non-achieving project objectives of AACRA roads is the slow clearance of obstructions from ROW construction limit. There is no formal risk management entertained by any of the parties to address the issue. This book also introduces a Project Definition Rating Index (PDRI) tool which is believed by the researcher helpful to assess scope definition completeness at various stages of AACRA road preproject planning process.VDM Verlag, Dudweiler Landstraße 99, 66123 Saarbrücken 232 pp. Englisch. Seller Inventory # 9783659964671
Seller: preigu, Osnabrück, Germany
Taschenbuch. Condition: Neu. ROW Risk Management of Road Construction Projects in Urban Areas | A Case Study of Addis Ababa, Ethiopia | Temesgen Tegabu | Taschenbuch | 232 S. | Englisch | 2018 | LAP LAMBERT Academic Publishing | EAN 9783659964671 | Verantwortliche Person für die EU: BoD - Books on Demand, In de Tarpen 42, 22848 Norderstedt, info[at]bod[dot]de | Anbieter: preigu. Seller Inventory # 114955124