Since, Design-Bid-Build (DBB) was the most popular project delivery method at the beginning of previous decade regardless of all its shortcomings, applying new advanced tools can compensate disadvantages of this method. Recently, advanced technology in construction management called Building Information Modeling (BIM) became popular among construction industry. Although, effects of BIM on different aspects of alternative project delivery methods were considered in literature, but adequate efforts on evaluating BIM application in DBB projects have not performed yet. This research aims to investigate effects of using BIM in DBB projects. For this reason, a questionnaire survey was conducted among construction industry practitioners in Iran to evaluate their opinions about using BIM in DBB projects. To assess reliability of questionnaire survey results, a single case was studied to compare cost and time of DBB projects in case of using BIM with real project which was executed without using BIM.
"synopsis" may belong to another edition of this title.
Seller: BuchWeltWeit Ludwig Meier e.K., Bergisch Gladbach, Germany
Taschenbuch. Condition: Neu. This item is printed on demand - it takes 3-4 days longer - Neuware -Since, Design-Bid-Build (DBB) was the most popular project delivery method at the beginning of previous decade regardless of all its shortcomings, applying new advanced tools can compensate disadvantages of this method. Recently, advanced technology in construction management called Building Information Modeling (BIM) became popular among construction industry. Although, effects of BIM on different aspects of alternative project delivery methods were considered in literature, but adequate efforts on evaluating BIM application in DBB projects have not performed yet. This research aims to investigate effects of using BIM in DBB projects. For this reason, a questionnaire survey was conducted among construction industry practitioners in Iran to evaluate their opinions about using BIM in DBB projects. To assess reliability of questionnaire survey results, a single case was studied to compare cost and time of DBB projects in case of using BIM with real project which was executed without using BIM. 104 pp. Englisch. Seller Inventory # 9783639766905
Seller: Books Puddle, New York, NY, U.S.A.
Condition: New. Seller Inventory # 26405873755
Seller: Majestic Books, Hounslow, United Kingdom
Condition: New. Print on Demand. Seller Inventory # 407280516
Quantity: 4 available
Seller: Biblios, Frankfurt am main, HESSE, Germany
Condition: New. PRINT ON DEMAND. Seller Inventory # 18405873745
Seller: moluna, Greven, Germany
Condition: New. Dieser Artikel ist ein Print on Demand Artikel und wird nach Ihrer Bestellung fuer Sie gedruckt. Autor/Autorin: Sanei Sistani NavidNavid Sanei Sistani graduated in Civil Engineering in 2009. During 2008 to 2011 he had experienced working in construction industry in different positions. By starting Master Degree in Construction Management in 20. Seller Inventory # 151401255
Quantity: Over 20 available
Seller: buchversandmimpf2000, Emtmannsberg, BAYE, Germany
Taschenbuch. Condition: Neu. This item is printed on demand - Print on Demand Titel. Neuware -Since, Design-Bid-Build (DBB) was the most popular project delivery method at the beginning of previous decade regardless of all its shortcomings, applying new advanced tools can compensate disadvantages of this method. Recently, advanced technology in construction management called Building Information Modeling (BIM) became popular among construction industry. Although, effects of BIM on different aspects of alternative project delivery methods were considered in literature, but adequate efforts on evaluating BIM application in DBB projects have not performed yet. This research aims to investigate effects of using BIM in DBB projects. For this reason, a questionnaire survey was conducted among construction industry practitioners in Iran to evaluate their opinions about using BIM in DBB projects. To assess reliability of questionnaire survey results, a single case was studied to compare cost and time of DBB projects in case of using BIM with real project which was executed without using BIM.VDM Verlag, Dudweiler Landstraße 99, 66123 Saarbrücken 104 pp. Englisch. Seller Inventory # 9783639766905
Seller: AHA-BUCH GmbH, Einbeck, Germany
Taschenbuch. Condition: Neu. nach der Bestellung gedruckt Neuware - Printed after ordering - Since, Design-Bid-Build (DBB) was the most popular project delivery method at the beginning of previous decade regardless of all its shortcomings, applying new advanced tools can compensate disadvantages of this method. Recently, advanced technology in construction management called Building Information Modeling (BIM) became popular among construction industry. Although, effects of BIM on different aspects of alternative project delivery methods were considered in literature, but adequate efforts on evaluating BIM application in DBB projects have not performed yet. This research aims to investigate effects of using BIM in DBB projects. For this reason, a questionnaire survey was conducted among construction industry practitioners in Iran to evaluate their opinions about using BIM in DBB projects. To assess reliability of questionnaire survey results, a single case was studied to compare cost and time of DBB projects in case of using BIM with real project which was executed without using BIM. Seller Inventory # 9783639766905
Seller: preigu, Osnabrück, Germany
Taschenbuch. Condition: Neu. Building Information Modeling Application in Design_Bid_Build Projects | A Case Study | Navid Sanei Sistani | Taschenbuch | 104 S. | Englisch | 2015 | Scholars' Press | EAN 9783639766905 | Verantwortliche Person für die EU: preigu GmbH & Co. KG, Lengericher Landstr. 19, 49078 Osnabrück, mail[at]preigu[dot]de | Anbieter: preigu. Seller Inventory # 104383512