A survey of the state of the art of deterministic resource-constrained project scheduling with time windows. General temporal constraints and several different types of limited resources are considered. A large variety of time-based, financial, and resource-based objectives - important in practice - are studied. A thorough structural analysis of the feasible region of project scheduling problems and a classification and detailed investigation of objective functions are performed, which can be exploited for developing efficient exact and heuristic solution methods. New interesting applications of project scheduling to production and operations management as well as investment projects are discussed in the second edition.
"synopsis" may belong to another edition of this title.
A survey of the state of the art of deterministic resource-constrained project scheduling with time windows. General temporal constraints and several different types of limited resources are considered. A large variety of time-based, financial, and resource-based objectives - important in practice - are studied. A thorough structural analysis of the feasible region of project scheduling problems and a classification and detailed investigation of objective functions are performed, which can be exploited for developing efficient exact and heuristic solution methods. New interesting applications of project scheduling to production and operations management as well as investment projects are discussed in the second edition.
"About this title" may belong to another edition of this title.
Seller: BuchWeltWeit Ludwig Meier e.K., Bergisch Gladbach, Germany
Buch. Condition: Neu. This item is printed on demand - it takes 3-4 days longer - Neuware -A survey of the state of the art of deterministic resource-constrained project scheduling with time windows. General temporal constraints and several different types of limited resources are considered. A large variety of time-based, financial, and resource-based objectives - important in practice - are studied. A thorough structural analysis of the feasible region of project scheduling problems and a classification and detailed investigation of objective functions are performed, which can be exploited for developing efficient exact and heuristic solution methods. New interesting applications of project scheduling to production and operations management as well as investment projects are discussed in the second edition. 404 pp. Englisch. Seller Inventory # 9783540401254
Seller: GreatBookPrices, Columbia, MD, U.S.A.
Condition: New. Seller Inventory # 5308338-n
Seller: moluna, Greven, Germany
Gebunden. Condition: New. Presents a survey of present state of resource-constrained project scheduling including models, solution methods, and applicationsPresents a survey of present state of resource-constrained project scheduling including models, solution methods,. Seller Inventory # 4888590
Seller: preigu, Osnabrück, Germany
Buch. Condition: Neu. Project Scheduling with Time Windows and Scarce Resources | Temporal and Resource-Constrained Project Scheduling with Regular and Nonregular Objective Functions | Klaus Neumann (u. a.) | Buch | xiii | Englisch | 2003 | Springer | EAN 9783540401254 | Verantwortliche Person für die EU: Springer Verlag GmbH, Tiergartenstr. 17, 69121 Heidelberg, juergen[dot]hartmann[at]springer[dot]com | Anbieter: preigu. Seller Inventory # 102528398
Seller: Books Puddle, Woodside, NY, U.S.A.
Condition: New. pp. 408 2nd Edition. Seller Inventory # 26348231
Seller: AHA-BUCH GmbH, Einbeck, Germany
Buch. Condition: Neu. Druck auf Anfrage Neuware - Printed after ordering - 1 Temporal Project Scheduling.- 1.1 Minimum and maximum time lags.- 1.2 Activity-on-node project networks.- 1.3 Temporal project scheduling computations.- 1.4 Orders in the set of activities.- 2 Resource-Constrained Project Scheduling - Minimization of Project Duration.- 2.1 Formulation of the problem.- 2.2 Cycle structures in activity-on-node project networks.- 2.3 Properties of the feasible region.- 2.4 Different types of shifts and sets of schedules.- 2.5 Branch-and-bound and truncated branch-and-bound methods.- 2.6 Priority-rule methods.- 2.7 Schedule-improvement procedures.- 2.8 Experimental performance analysis.- 2.9 Application to make-to-order production in manufacturing industry.- 2.10 Regular objective functions different from project duration.- 2.11 Calendarization.- 2.12 Project scheduling with cumulative resources.- 2.13 Project scheduling with synchronizing resources.- 2.14 Project scheduling with sequence-dependent changeover times.- 2.15 Multi-mode project scheduling problems.- 2.16 Application to batch production in process industries.- 3 Resource-Constrained Project Scheduling - Minimization of General Objective Functions.- 3.1 Different objective functions.- 3.2 Additional types of shifts and sets of schedules.- 3.3 Classification of objective functions.- 3.4 Time complexity of time-constrained project scheduling.- 3.5 Relaxation-based approach for function classes 1 to 5.- 3.6 Tree-based approach for function classes 6 and 7.- 3.7 Priority-rule methods.- 3.8 Schedule-improvement procedures.- 3.9 Application to investment projects.- 3.10 Hierarchical project planning.- References.- List of Symbols.- Three-Field Classification for Resource-Constrained Project Scheduling. Seller Inventory # 9783540401254
Seller: buchversandmimpf2000, Emtmannsberg, BAYE, Germany
Buch. Condition: Neu. This item is printed on demand - Print on Demand Titel. Neuware -1 Temporal Project Scheduling.- 1.1 Minimum and maximum time lags.- 1.2 Activity-on-node project networks.- 1.3 Temporal project scheduling computations.- 1.4 Orders in the set of activities.- 2 Resource-Constrained Project Scheduling - Minimization of Project Duration.- 2.1 Formulation of the problem.- 2.2 Cycle structures in activity-on-node project networks.- 2.3 Properties of the feasible region.- 2.4 Different types of shifts and sets of schedules.- 2.5 Branch-and-bound and truncated branch-and-bound methods.- 2.6 Priority-rule methods.- 2.7 Schedule-improvement procedures.- 2.8 Experimental performance analysis.- 2.9 Application to make-to-order production in manufacturing industry.- 2.10 Regular objective functions different from project duration.- 2.11 Calendarization.- 2.12 Project scheduling with cumulative resources.- 2.13 Project scheduling with synchronizing resources.- 2.14 Project scheduling with sequence-dependent changeover times.- 2.15 Multi-mode project scheduling problems.- 2.16 Application to batch production in process industries.- 3 Resource-Constrained Project Scheduling - Minimization of General Objective Functions.- 3.1 Different objective functions.- 3.2 Additional types of shifts and sets of schedules.- 3.3 Classification of objective functions.- 3.4 Time complexity of time-constrained project scheduling.- 3.5 Relaxation-based approach for function classes 1 to 5.- 3.6 Tree-based approach for function classes 6 and 7.- 3.7 Priority-rule methods.- 3.8 Schedule-improvement procedures.- 3.9 Application to investment projects.- 3.10 Hierarchical project planning.- References.- List of Symbols.- Three-Field Classification for Resource-Constrained Project Scheduling.Springer-Verlag KG, Sachsenplatz 4-6, 1201 Wien 404 pp. Englisch. Seller Inventory # 9783540401254
Seller: Majestic Books, Hounslow, United Kingdom
Condition: New. Print on Demand pp. 408 Illus. Seller Inventory # 7532440
Quantity: 4 available
Seller: Biblios, Frankfurt am main, HESSE, Germany
Condition: New. PRINT ON DEMAND pp. 408. Seller Inventory # 18348237
Seller: Mispah books, Redhill, SURRE, United Kingdom
Hardcover. Condition: Like New. LIKE NEW. SHIPS FROM MULTIPLE LOCATIONS. book. Seller Inventory # ERICA75835404012535
Quantity: 1 available