This report documents the activities, findings, and NASA Engineering and Safety Center (NESC) recommendations of a multidiscipline team to independently assess the Constellation Program (CxP) Crew Exploration Vehicle (CEV) Parachute Assembly System (CPAS). This assessment occurred during a period of 15 noncontiguous months between December 2008 and April 2010, prior to the CPAS Project’s Preliminary Design Review (PDR) in August 2010. The assessment team‘s planned objectives were to identify reliability-enhancing opportunities for the CPAS Project: Parachute system design, Reliability estimation methodologies, Development program (development tests and analysis, and verification plans), Design development and integration practices.
"synopsis" may belong to another edition of this title.
Seller: GreatBookPrices, Columbia, MD, U.S.A.
Condition: As New. Unread book in perfect condition. Seller Inventory # 22219406
Seller: GreatBookPricesUK, Woodford Green, United Kingdom
Condition: As New. Unread book in perfect condition. Seller Inventory # 22219406
Quantity: Over 20 available
Seller: THE SAINT BOOKSTORE, Southport, United Kingdom
Paperback / softback. Condition: New. This item is printed on demand. New copy - Usually dispatched within 5-9 working days. Seller Inventory # C9781503272927
Quantity: Over 20 available
Seller: GreatBookPricesUK, Woodford Green, United Kingdom
Condition: New. Seller Inventory # 22219406-n
Quantity: Over 20 available
Seller: GreatBookPrices, Columbia, MD, U.S.A.
Condition: New. Seller Inventory # 22219406-n
Seller: CitiRetail, Stevenage, United Kingdom
Paperback. Condition: new. Paperback. This report documents the activities, findings, and NASA Engineering and Safety Center (NESC) recommendations of a multidiscipline team to independently assess the Constellation Program (CxP) Crew Exploration Vehicle (CEV) Parachute Assembly System (CPAS). This assessment occurred during a period of 15 noncontiguous months between December 2008 and April 2010, prior to the CPAS Project's Preliminary Design Review (PDR) in August 2010. The assessment team's planned objectives were to identify reliability-enhancing opportunities for the CPAS Project: Parachute system design, Reliability estimation methodologies, Development program (development tests and analysis, and verification plans), Design development and integration practices. Shipping may be from our UK warehouse or from our Australian or US warehouses, depending on stock availability. Seller Inventory # 9781503272927
Quantity: 1 available