This report provides key results from a 30-month research and development project to study the effects of normal aging on the calibration and response time of nuclear plant pressure, level, and flow transmitters and to develop and validate new methods for testing the performance of the transmitters as installed in nuclear power plants. The project focused on aging tests of complete transmitter assemblies and critical transmitter components; testing the effects of sensing-line length, blockages, and voids on pressure sensor response time; investigating the oil loss phenomenon in Rosemount and other transmitters; validating new methods for on-line testing of pressure transmitter response time; investigating on-line detection of oil loss in Rosemount transmitters; and analyzing Licensee Event Report and Nuclear Plant Reliability Data System databases for pressure sensor failures in nuclear power plants. The authors demonstrated that the practice of response time testing and calibration once every 18 to 24 months is adequate for managing the normal aging of pressure transmitters.
"synopsis" may belong to another edition of this title.
Seller: California Books, Miami, FL, U.S.A.
Condition: New. Print on Demand. Seller Inventory # I-9781499576924
Seller: GreatBookPrices, Columbia, MD, U.S.A.
Condition: As New. Unread book in perfect condition. Seller Inventory # 37415549
Seller: GreatBookPricesUK, Woodford Green, United Kingdom
Condition: As New. Unread book in perfect condition. Seller Inventory # 37415549
Quantity: Over 20 available
Seller: GreatBookPricesUK, Woodford Green, United Kingdom
Condition: New. Seller Inventory # 37415549-n
Quantity: Over 20 available
Seller: CitiRetail, Stevenage, United Kingdom
Paperback. Condition: new. Paperback. This report provides key results from a 30-month research and development project to study the effects of normal aging on the calibration and response time of nuclear plant pressure, level, and flow transmitters and to develop and validate new methods for testing the performance of the transmitters as installed in nuclear power plants. The project focused on aging tests of complete transmitter assemblies and critical transmitter components; testing the effects of sensing-line length, blockages, and voids on pressure sensor response time; investigating the oil loss phenomenon in Rosemount and other transmitters; validating new methods for on-line testing of pressure transmitter response time; investigating on-line detection of oil loss in Rosemount transmitters; and analyzing Licensee Event Report and Nuclear Plant Reliability Data System databases for pressure sensor failures in nuclear power plants. The authors demonstrated that the practice of response time testing and calibration once every 18 to 24 months is adequate for managing the normal aging of pressure transmitters. This item is printed on demand. Shipping may be from our UK warehouse or from our Australian or US warehouses, depending on stock availability. Seller Inventory # 9781499576924
Quantity: 1 available
Seller: GreatBookPrices, Columbia, MD, U.S.A.
Condition: New. Seller Inventory # 37415549-n
Seller: THE SAINT BOOKSTORE, Southport, United Kingdom
Paperback / softback. Condition: New. This item is printed on demand. New copy - Usually dispatched within 5-9 working days. Seller Inventory # C9781499576924
Quantity: Over 20 available