Design criteria for the construction or rehabilitation of dams and hydraulic structures generally begin with a section defining the design flood. Flood determination methods have evolved over the years, but must continue to progress given the degree of uncertainty surrounding the assessment of extreme floods and the fact that factors external to flooding must be taken into account in risk assessment. This ICOLD Bulletin 187 follows in the footsteps of the previous one. It consists of three main chapters following the introductory chapter. The second chapter examines the main aspects of flood volume. The third chapter follows on from the previous bulletin and looks in more detail at stochastic approaches to flood risk assessment. The final chapter deals with the forecasting aspects of proactive flood management. Case studies illustrating short-, medium- and long-term management challenges are presented in Appendix A.
Les critères de conception pour la construction ou la réhabilitation des barrages et des structures hydrauliques commencent généralement par une section définissant la crue de projet. Les méthodes de détermination des crues ont évolué au fil des ans, mais elles doivent continuer à progresser étant donné le degré d'incertitude concernant l'évaluation des crues extrêmes et le fait que les facteurs externes aux crues doivent être pris en compte dans l'évaluation des risques. Ce ICOLD Bulletin 187 suit les traces du précédent bulletin. Il se compose de trois chapitres principaux faisant suite au chapitre d'introduction. Le deuxième chapitre examine les principaux aspects liés au volume des crues. Le troisième chapitre fait suite au bulletin précédent et aborde plus en détail les approches stochastiques concernant l'évaluation des risques de crues. Le dernier chapitre traite des aspects prévisionnels liés à la gestion proactive des crues. Des études de cas illustrant les défis de gestion à court, moyen ou long terme sont présentées à l'annexe A.
"synopsis" may belong to another edition of this title.
The Commission Internationale des Grands Barrages (CIGB) / International Commission on Large Dams (ICOLD) is a non-governmental International Organization which provides a forum for the exchange of knowledge and experience in dam engineering.
The Organization leads the profession in ensuring that dams are built safely, efficiently, economically, and without detrimental effects on the environment. Its original aim was to encourage advances in the planning, design, construction, operation, and maintenance of large dams and their associated civil works, by collecting and disseminating relevant information and by studying related technical questions.
Since the late sixties, focus was put on subjects of current concern such as dam safety, monitoring of performance, reanalysis of older dams and spillways, effects of ageing and environmental impact. More recently, new subjects include cost studies at the planning and construction stages, harnessing international rivers, information for the public at large, and financing.
"About this title" may belong to another edition of this title.
Seller: Basi6 International, Irving, TX, U.S.A.
Condition: Brand New. New. US edition. Expediting shipping for all USA and Europe orders excluding PO Box. Excellent Customer Service. Seller Inventory # ABEOCT25-311260
Seller: Grand Eagle Retail, Bensenville, IL, U.S.A.
Paperback. Condition: new. Paperback. Design criteria for the construction or rehabilitation of dams and hydraulic structures generally begin with a section defining the design flood. Flood determination methods have evolved over the years, but must continue to progress given the degree of uncertainty surrounding the assessment of extreme floods and the fact that factors external to flooding must be taken into account in risk assessment. This ICOLD Bulletin 187 follows in the footsteps of the previous one. It consists of three main chapters following the introductory chapter. The second chapter examines the main aspects of flood volume. The third chapter follows on from the previous bulletin and looks in more detail at stochastic approaches to flood risk assessment. The final chapter deals with the forecasting aspects of proactive flood management. Case studies illustrating short-, medium- and long-term management challenges are presented in Appendix A.Les criteres de conception pour la construction ou la rehabilitation des barrages et des structures hydrauliques commencent generalement par une section definissant la crue de projet. Les methodes de determination des crues ont evolue au fil des ans, mais elles doivent continuer a progresser etant donne le degre d'incertitude concernant l'evaluation des crues extremes et le fait que les facteurs externes aux crues doivent etre pris en compte dans l'evaluation des risques. Ce ICOLD Bulletin 187 suit les traces du precedent bulletin. Il se compose de trois chapitres principaux faisant suite au chapitre d'introduction. Le deuxieme chapitre examine les principaux aspects lies au volume des crues. Le troisieme chapitre fait suite au bulletin precedent et aborde plus en detail les approches stochastiques concernant l'evaluation des risques de crues. Le dernier chapitre traite des aspects previsionnels lies a la gestion proactive des crues. Des etudes de cas illustrant les defis de gestion a court, moyen ou long terme sont presentees a l'annexe A. ICOLD Bulletin 187 begins with a section defining the design flood, followed by three main chapters. The second chapter examines the main aspects of flood volume. The third chapter looks in more detail at stochastic approaches to flood risk assessment. The final chapter deals with the forecasting aspects of proactive flood management. This item is printed on demand. Shipping may be from multiple locations in the US or from the UK, depending on stock availability. Seller Inventory # 9781032987354
Seller: Books Puddle, New York, NY, U.S.A.
Condition: New. Seller Inventory # 26403618726
Seller: GreatBookPrices, Columbia, MD, U.S.A.
Condition: New. Seller Inventory # 49461081-n
Seller: Majestic Books, Hounslow, United Kingdom
Condition: New. Seller Inventory # 410584185
Quantity: 4 available
Seller: Biblios, Frankfurt am main, HESSE, Germany
Condition: New. Seller Inventory # 18403618732
Seller: GreatBookPricesUK, Woodford Green, United Kingdom
Condition: New. Seller Inventory # 49461081-n
Quantity: 10 available
Seller: GreatBookPrices, Columbia, MD, U.S.A.
Condition: As New. Unread book in perfect condition. Seller Inventory # 49461081
Seller: GreatBookPricesUK, Woodford Green, United Kingdom
Condition: As New. Unread book in perfect condition. Seller Inventory # 49461081
Quantity: 10 available
Seller: THE SAINT BOOKSTORE, Southport, United Kingdom
Paperback / softback. Condition: New. New copy - Usually dispatched within 4 working days. Seller Inventory # B9781032987354
Quantity: 1 available