The great expositors of Blake and those who have followed in their footsteps have clarified the most minute particulars of Blake's vision. Now, in the place of traditional exegesis, comes a significantly new set of critical problems and interpretive methods. In this volume of essays, the major shift in Blake studies, already under way in practice, is addressed, gauged, analyzed, and debated.
The contributors assembled here, leading exponents of contemporary critical methods as well as close students of Blake, argue the grounds, purposes, and validity of each approach and then apply its method in detailed readings of Blake's works. We see deconstruction, psychoanalytic interpretation, feminist critique, semiotic analysis, Marxist criticism, revisionism, and other methods brought to bear on Blake's texts and into confrontation with one another by those best able to do so.
Through the essays themselves and in the reaction they will certainly provoke, Critical Paths will bring increased theoretical awareness to the study of Blake and will further the ongoing redefinition of Blake's art. At the same time, the collection investigates the general problem of methodology in literary studies by means of a casebook examination of modern critical approaches. Blake criticism and current literary theory here come together; the encounter illuminates and enriches both.
"synopsis" may belong to another edition of this title.
"This timely collection of essays ads tot he momentum that has been building in recent years for a fresh start in Blake studies--an impulse both to cleanse the doors of perception of Blake's critics and to sweep out the interpreter's parlor in which his now-familiar body of poetry has come to reside. . . . The most appealing feature of "Critical Paths" is its spirit of exploration--its zest in challenging cherished assumptions, its impatience with questions that have been asked too often, its agile movement between skepticism and affirmation, its air of the workshop rather than the museum or the shrine."--Mary Lynn Johnson
Rowan is based in Seattle, Washington and works as a Program Manager for the ADO.Net Entity Framework team at Microsoft. Prior to moving to the US he resided in the small state of Tasmania in Australia. Rowan speaks at technical conferences and blogs at http: //romiller.com. Outside of technology Rowan's passions include snowboarding, mountain biking, horse riding, rock climbing and pretty much anything else that involves being active. The primary focus of his life, however, is to follow Jesus.
"About this title" may belong to another edition of this title.
Seller: Red's Corner LLC, Tucker, GA, U.S.A.
Paperback. Condition: Fine. Grade 4 out of 5 points. This is a used book. Book may have wear due to handling. Has no markings on pages. May not include extra materials like access codes, CDs, accessories, etc. All orders ship by next business day! We are a small company and very thankful for your business! Seller Inventory # mon0000052901
Seller: Midtown Scholar Bookstore, Harrisburg, PA, U.S.A.
Paperback. Condition: Good. Fading. Good - Bumped and creased book with tears to the extremities, but not affecting the text block, may have remainder mark or previous owner's name - GOOD Standard-sized. Seller Inventory # M0822307928Z3
Seller: Books From California, Simi Valley, CA, U.S.A.
paperback. Condition: Good. Ex- library copy with stamps/ stickers. Seller Inventory # mon0003379514
Seller: Kenneth A. Himber, Lebanon, NJ, U.S.A.
Soft cover. Condition: As New. First Softcover Edition. Softcover is a clean tight unmarked copy. Seller Inventory # 001453