The main construction of HS2, Britain’s new zero carbon, high-speed railway, began in September 2020, when delivery activity on Phase One moved from enabling works, scheme design and preparatory work to full construction of the railway. The new railway will link London and the West Midlands and eventually extend services to the North and Scotland. High-speed trains powered by zero carbon electricity will reach speeds of 225mph and transform journey times, while opening up capacity on the existing, conventional railway network.
This volume of High Speed Two: Infrastructure Design and Construction from the HS2 Project, contains a collection of papers submitted to HS2 Ltd’s Technical Papers Competition. Contributions have come from consultants, contractors, suppliers and third-party stakeholders involved in the delivery of HS2. As part of HS2’s Learning Legacy programme, the organisation seeks to share its learnings and best practices with the rest of the industry throughout the project lifecycle. This volume includes high-quality papers on best practice in planning, design, construction and management for large-scale railway infrastructure projects. It is divided into two sections: ground engineering (geotechnics, groundworks and earthworks) and structural engineering (bridges, viaducts, tunnels and underground structures).
"synopsis" may belong to another edition of this title.
Seller: suffolkbooks, Center moriches, NY, U.S.A.
hardcover. Condition: Very Good. Fast Shipping - Safe and Secure 7 days a week! Seller Inventory # 3TWOWA002FAL
Seller: PBShop.store UK, Fairford, GLOS, United Kingdom
HRD. Condition: New. New Book. Shipped from UK. Established seller since 2000. Seller Inventory # FW-9780727766892
Quantity: 15 available
Seller: Rarewaves.com USA, London, LONDO, United Kingdom
Hardback. Condition: New. The main construction of HS2, Britain's new zero carbon, high-speed railway, began in September 2020, when delivery activity on Phase One moved from enabling works, scheme design and preparatory work to full construction of the railway. The new railway will link London and the West Midlands and eventually extend services to the North and Scotland. High-speed trains powered by zero carbon electricity will reach speeds of 225mph and transform journey times, while opening up capacity on the existing, conventional railway network.This volume of High Speed Two: Infrastructure Design and Construction from the HS2 Project, contains a collection of papers submitted to HS2 Ltd's Technical Papers Competition. Contributions have come from consultants, contractors, suppliers and third-party stakeholders involved in the delivery of HS2. As part of HS2's Learning Legacy programme, the organisation seeks to share its learnings and best practices with the rest of the industry throughout the project lifecycle. This volume includes high-quality papers on best practice in planning, design, construction and management for large-scale railway infrastructure projects. It is divided into two sections: ground engineering (geotechnics, groundworks and earthworks) and structural engineering (bridges, viaducts, tunnels and underground structures). Seller Inventory # LU-9780727766892
Quantity: Over 20 available
Seller: Grand Eagle Retail, Bensenville, IL, U.S.A.
Hardcover. Condition: new. Hardcover. The main construction of HS2, Britain's new zero carbon, high-speed railway, began in September 2020, when delivery activity on Phase One moved from enabling works, scheme design and preparatory work to full construction of the railway. The new railway will link London and the West Midlands and eventually extend services to the North and Scotland. High-speed trains powered by zero carbon electricity will reach speeds of 225mph and transform journey times, while opening up capacity on the existing, conventional railway network.This volume of High Speed Two: Infrastructure Design and Construction from the HS2 Project, contains a collection of papers submitted to HS2 Ltd's Technical Papers Competition. Contributions have come from consultants, contractors, suppliers and third-party stakeholders involved in the delivery of HS2. As part of HS2's Learning Legacy programme, the organisation seeks to share its learnings and best practices with the rest of the industry throughout the project lifecycle. This volume includes high-quality papers on best practice in planning, design, construction and management for large-scale railway infrastructure projects. It is divided into two sections: ground engineering (geotechnics, groundworks and earthworks) and structural engineering (bridges, viaducts, tunnels and underground structures). This volume includes high-quality papers on best practice in planning, design, construction and management for large-scale railway infrastructure projects. It is divided into two sections: ground engineering (geotechnics, groundworks and earthworks) and structural engineering (bridges, viaducts, tunnels and underground structures). Shipping may be from multiple locations in the US or from the UK, depending on stock availability. Seller Inventory # 9780727766892
Seller: Books Puddle, New York, NY, U.S.A.
Condition: New. Seller Inventory # 26396083491
Seller: Majestic Books, Hounslow, United Kingdom
Condition: New. Seller Inventory # 401374972
Quantity: 1 available
Seller: Brook Bookstore On Demand, Napoli, NA, Italy
Condition: new. Seller Inventory # 39AWJ0RQ0I
Quantity: Over 20 available
Seller: THE SAINT BOOKSTORE, Southport, United Kingdom
Hardback. Condition: New. New copy - Usually dispatched within 4 working days. Seller Inventory # B9780727766892
Quantity: Over 20 available
Seller: Kennys Bookshop and Art Galleries Ltd., Galway, GY, Ireland
Condition: New. Seller Inventory # V9780727766892
Quantity: Over 20 available
Seller: Rarewaves USA, OSWEGO, IL, U.S.A.
Hardback. Condition: New. The main construction of HS2, Britain's new zero carbon, high-speed railway, began in September 2020, when delivery activity on Phase One moved from enabling works, scheme design and preparatory work to full construction of the railway. The new railway will link London and the West Midlands and eventually extend services to the North and Scotland. High-speed trains powered by zero carbon electricity will reach speeds of 225mph and transform journey times, while opening up capacity on the existing, conventional railway network.This volume of High Speed Two: Infrastructure Design and Construction from the HS2 Project, contains a collection of papers submitted to HS2 Ltd's Technical Papers Competition. Contributions have come from consultants, contractors, suppliers and third-party stakeholders involved in the delivery of HS2. As part of HS2's Learning Legacy programme, the organisation seeks to share its learnings and best practices with the rest of the industry throughout the project lifecycle. This volume includes high-quality papers on best practice in planning, design, construction and management for large-scale railway infrastructure projects. It is divided into two sections: ground engineering (geotechnics, groundworks and earthworks) and structural engineering (bridges, viaducts, tunnels and underground structures). Seller Inventory # LU-9780727766892