Operations Research began with the mathematical scheduling of a massive project―logistically supplying Europe with military equipment and goods during the WWII. Today project scheduling research continues growing in a variety of its theoretical models, in its magnitude and application. As the world becomes more interrelated and complex, the wider its research is applied to an increasing number of project scheduling problems.
Project Scheduling: Surveying the State-of-the-Art surveys the current state-of-the-art in operations research with chapters written by the respective leading experts on each topic. It covers the range of the key models in the field, including deterministic, probabilistic, single- and multi-mode, single- and multi-objective, and a general model on discrete-continuous resources. Recent solution algorithms are systematical examined. The book summarize sthe current developments and theoretical achievements in the field, including project uncertainty and grid resource management.
"synopsis" may belong to another edition of this title.
Operations Research began as a field with the mathematical scheduling of a massive project - logistically supplying Europe with military equipment and goods during the 2nd World War. Today project scheduling research continues to grow in the variety of its theoretical models, in its magnitude, and in its application. As the world becomes more interrelated and complex, the wider its research is applied to an increasing number of project scheduling problems. The book surveys the current state-of-the-art in this realm of operations research with chapters written by the respective leading experts on each topic. It will cover the range of the key models in the field, including deterministic, probabilistic, single- and multi-mode, single- and multi-objective, and a general model on discrete-continuous resources. Recent solution algorithms are systematically examined. The book summarizes the current developments and theoretical achievements in the field.These new developments include project uncertainty and grid resource management. "Perspectives in Modern Project Scheduling" systematically presents this dynamically developing area in three parts.
Part I discusses new models of the project management process that are being developed. They include an alternative to the well-known PERT technique, consideration of disturbances during the project realization, introduction of new constraints like due dates or setup times, as well as a general discussion on classification of resources. Part II outlines and evaluates the new algorithms that have been developed to solve the strongly NP-hard resource constrained project scheduling efficiently with acceptable accuracy. New lower bounds for the RCPSP are proposed, followed by smart justification technique and a series of Metaheuristics. Finally, a neural network approach is introduced.Part III is devoted to new areas of applications of the project management models and the algorithms - for example, pharmaceutical research, grid computing, factory pick-up of new cars, batch scheduling in process industries and make-to-order (project driven) manufacturing - that have been developed to solve project scheduling problems in these application areas.The book will be of interest to academics and students in project management and scheduling in Business Schools, Operations Research/Management Science, Computer Science & Engineering, Systems Analysis, and Applied Mathematics. In addition, decision makers, consultants and practitioners in industry, government and service organizations will also be interested in this book."About this title" may belong to another edition of this title.
Seller: Basi6 International, Irving, TX, U.S.A.
Condition: Brand New. New. US edition. Expediting shipping for all USA and Europe orders excluding PO Box. Excellent Customer Service. Seller Inventory # ABEOCT25-82480
Seller: Romtrade Corp., STERLING HEIGHTS, MI, U.S.A.
Condition: New. This is a Brand-new US Edition. This Item may be shipped from US or any other country as we have multiple locations worldwide. Seller Inventory # ABBB-72034
Seller: Basi6 International, Irving, TX, U.S.A.
Condition: Brand New. New. US edition. Expediting shipping for all USA and Europe orders excluding PO Box. Excellent Customer Service. Seller Inventory # ABEOCT25-82479
Seller: Romtrade Corp., STERLING HEIGHTS, MI, U.S.A.
Condition: New. This is a Brand-new US Edition. This Item may be shipped from US or any other country as we have multiple locations worldwide. Seller Inventory # ABBB-159350
Seller: SMASS Sellers, IRVING, TX, U.S.A.
Condition: New. Brand New Original US Edition. Customer service! Satisfaction Guaranteed. Seller Inventory # SNTA-72034
Seller: GreatBookPrices, Columbia, MD, U.S.A.
Condition: New. Seller Inventory # 4372943-n
Seller: Basi6 International, Irving, TX, U.S.A.
Condition: Brand New. New. US edition. Expediting shipping for all USA and Europe orders excluding PO Box. Excellent Customer Service. Seller Inventory # ABEOCT25-82481
Seller: UK BOOKS STORE, London, LONDO, United Kingdom
Condition: New. Brand New! Fast Delivery This is an International Edition and ship within 24-48 hours. Deliver by FedEx and Dhl, & Aramex, UPS, & USPS and we do accept APO and PO BOX Addresses. Order can be delivered worldwide within 6-10 days and we do have flat rate for up to 2LB. Extra shipping charges will be requested if the Book weight is more than 5 LB. This Item May be shipped from India, United states & United Kingdom. Depending on your location and availability. Seller Inventory # Cvs 9780387336435
Quantity: 19 available
Seller: California Books, Miami, FL, U.S.A.
Condition: New. Seller Inventory # I-9780387336435
Seller: GreatBookPricesUK, Woodford Green, United Kingdom
Condition: New. Seller Inventory # 4372943-n
Quantity: Over 20 available