Critical pathways were developed in the US to ensure that all patients receiving treatment for a certain condition received exactly the same treatment. They contain step-by-step instructions detailing what each member of the team needs to do on certain days. This text is unique in its integrative approach to rehabilitation. Pulling together diverse disease and concepts from sports medicine, physiotherapy and occupational therapy, ergonomics, geriatrics, kinesiology and physiotherapy, each chapter represents a comprehensive literature review of the specific pathologies which are most commonly encountered. The case study format simulates the signs and symptoms observed and measured during an actual examination. The subsequent question and answer format is logically organised, so the concepts emerge in a step-by-step flow of ideas. Each chapter is independent of other chapters, all with an interactive approach.
"synopsis" may belong to another edition of this title.
Seller: Better World Books, Mishawaka, IN, U.S.A.
Condition: Good. 1st. Pages intact with minimal writing/highlighting. The binding may be loose and creased. Dust jackets/supplements are not included. Stock photo provided. Product includes identifying sticker. Better World Books: Buy Books. Do Good. Seller Inventory # 7831185-6
Seller: Better World Books, Mishawaka, IN, U.S.A.
Condition: Fine. 1st. Used book that is in almost brand-new condition. May contain a remainder mark. Better World Books: Buy Books. Do Good. Seller Inventory # 18579672-6
Seller: BooksRun, Philadelphia, PA, U.S.A.
Hardcover. Condition: Fair. 1. The item might be beaten up but readable. May contain markings or highlighting, as well as stains, bent corners, or any other major defect, but the text is not obscured in any way. Markings in workbook. Seller Inventory # 032300105X-7-1-117
Seller: Bay State Book Company, North Smithfield, RI, U.S.A.
Condition: good. The book is in good condition with all pages and cover intact, including the dust jacket if originally issued. The spine may show light wear. Pages may contain some notes or highlighting, and there might be a "From the library of" label. Boxed set packaging, shrink wrap, or included media like CDs may be missing. Seller Inventory # BSM.1BDCU
Seller: Coas Books, Las Cruces, NM, U.S.A.
Condition: acceptable. Cover image may vary. Cover is worn. Pages are sunned. Item has staining and markings. Hardcover. Seller Inventory # COBV.032300105X.A
Seller: ThriftBooks-Atlanta, AUSTELL, GA, U.S.A.
Hardcover. Condition: Good. No Jacket. Pages can have notes/highlighting. Spine may show signs of wear. ~ ThriftBooks: Read More, Spend Less. Seller Inventory # G032300105XI3N00
Seller: ThriftBooks-Atlanta, AUSTELL, GA, U.S.A.
Hardcover. Condition: Very Good. No Jacket. May have limited writing in cover pages. Pages are unmarked. ~ ThriftBooks: Read More, Spend Less. Seller Inventory # G032300105XI4N00
Seller: Anybook.com, Lincoln, United Kingdom
Condition: Poor. This is an ex-library book and may have the usual library/used-book markings inside.This book has hardback covers. Clean from markings. In poor condition, suitable as a reading copy. No dust jacket. Please note the Image in this listing is a stock photo and may not match the covers of the actual item,2350grams, ISBN:9780323001052. Seller Inventory # 7071667
Quantity: 1 available
Seller: BennettBooksLtd, Los Angeles, CA, U.S.A.
hardcover. Condition: New. In shrink wrap. Looks like an interesting title! Seller Inventory # Q-032300105X