Repetitive Project Scheduling: Theory and Methods is the first book to comprehensively, and systematically, review new methods for scheduling repetitive projects that have been developed in response to the weaknesses of the most popular method for project scheduling, the Critical Path Method (CPM). As projects with significant levels of repetitive scheduling are common in construction and engineering, especially construction of buildings with multiple stories, highways, tunnels, pipelines, power distribution networks, and so on, the book fills a much needed gap, introducing the main repetitive project scheduling methods, both comprehensively and systematically. Users will find valuable information on core methodologies, including how to identify the controlling path and controlling segment, how to convert RSM to a network model, and examples based on practical scheduling problems. * Introduces the repetitive scheduling method with analysis of the pros and cons, as well as the latest developments* Discusses the two basic theoretical topics, identifying the controlling path and transferring the RSM to a network model * Focuses on practical problems and algorithms * Provides an essential resource for researchers, managers, and engineers in the field of engineering project and construction management
"synopsis" may belong to another edition of this title.
Li-Hui Zhang is an associate professor in School of Economics and Management, North China Electric Power University (NCEPU), with extensive teaching and project management and operations research experience for 12 years. He has published more than 30 papers (in Chinese and English) and 3 books (in Chinese) in these areas. The proposed book research was supported by the National Natural Science Foundation of China.
"About this title" may belong to another edition of this title.
Seller: Brook Bookstore On Demand, Napoli, NA, Italy
Condition: new. Questo è un articolo print on demand. Seller Inventory # e9a351fd7246437a64104368447c6687
Quantity: Over 20 available
Seller: Revaluation Books, Exeter, United Kingdom
Paperback. Condition: Brand New. 112 pages. 9.25x6.25x0.75 inches. In Stock. This item is printed on demand. Seller Inventory # __0128017635
Quantity: 2 available
Seller: Chiron Media, Wallingford, United Kingdom
Paperback. Condition: New. Seller Inventory # 6666-ELS-9780128017630
Quantity: Over 20 available
Seller: Majestic Books, Hounslow, United Kingdom
Condition: New. pp. 112. Seller Inventory # 373586230
Quantity: 3 available
Seller: GreatBookPrices, Columbia, MD, U.S.A.
Condition: New. Seller Inventory # 23991631-n
Seller: Books Puddle, New York, NY, U.S.A.
Condition: New. pp. 112. Seller Inventory # 26372492009
Seller: BuchWeltWeit Ludwig Meier e.K., Bergisch Gladbach, Germany
Buch. Condition: Neu. This item is printed on demand - it takes 3-4 days longer - Neuware -Repetitive Project Scheduling: Theory and Methods is the first book to comprehensively, and systematically, review new methods for scheduling repetitive projects that have been developed in response to the weaknesses of the most popular method for project scheduling, the Critical Path Method (CPM). As projects with significant levels of repetitive scheduling are common in construction and engineering, especially construction of buildings with multiple stories, highways, tunnels, pipelines, power distribution networks, and so on, the book fills a much needed gap, introducing the main repetitive project scheduling methods, both comprehensively and systematically. Users will find valuable information on core methodologies, including how to identify the controlling path and controlling segment, how to convert RSM to a network model, and examples based on practical scheduling problems. Englisch. Seller Inventory # 9780128017630
Seller: GreatBookPrices, Columbia, MD, U.S.A.
Condition: As New. Unread book in perfect condition. Seller Inventory # 23991631
Seller: THE SAINT BOOKSTORE, Southport, United Kingdom
Paperback / softback. Condition: New. New copy - Usually dispatched within 4 working days. Seller Inventory # B9780128017630
Quantity: Over 20 available
Seller: Biblios, Frankfurt am main, HESSE, Germany
Condition: New. pp. 112. Seller Inventory # 18372492003