GM 6.2 and 6.5 Liter Diesel Engines: How to Rebuild and Modify
Language: English
Published by SA Design, 2020
- Softcover
- New

Seller: Biblios, frankfurt am main, hessen, GermanyBiblios
AbeBooks seller since September 10, 2024
Condition: New
£ 41.57
Quantity: 3 available
Add to basketItem description from seller
pp. 144.
Seller Inventory # 18378044654
- Title
- GM 6.2 and 6.5 Liter Diesel Engines: How to Rebuild and Modify
- Author
- Kershaw EdD PhD, John
- Publisher
- SA Design
- Publication year
- 2020
- Condition
- New
- Binding
- Soft cover
- Language
- English
- ISBN 10
- 1613255608
- ISBN 13
- 9781613255605
Finally, a rebuild and performance guide for GM 6.2 and 6.5L diesel engines!
In the late 1970s and early 1980s, there was considerable pressure on the Detroit automakers to increase the fuel efficiency for their automotive and light-truck lines. While efficient electronic engine controls and computer-controlled gas engine technology was still in the developmental stages, the efficiency of diesel engines was already well documented during this time period. As a result, General Motors added diesel engine options to its car and truck lines in an attempt to combat high gas prices and increase fuel efficiency.
The first mass-produced V-8 diesel engines of the era, the 5.7L variants, appeared in several General Motors passenger-car models beginning in 1978 and are often referred to as the Oldsmobile Diesels because of the number of Oldsmobile cars equipped with this option. This edition faded from popularity in the early 1980s as a result of falling gas prices and quality issues with diesel fuel suppliers, giving the cars a bad reputation for dependability and reliability. The 6.2L appeared in 1982 and the 6.5L in 1992, as the focus for diesel applications shifted from cars to light trucks. These engines served faithfully and remained in production until 2001, when the new Duramax design replaced it in all but a few military applications.
While very durable and reliable, most of these engines have a lot of miles on them, and many are in need of a rebuild. This book will take you through the entire rebuild process step by step from diagnosis to tear down, inspection to parts sourcing, machining, and finally reassembly. Also included is valuable troubleshooting information, detailed explanations of how systems work, and even a complete Stanadyne DB2 rebuild section to get the most out of your engine in the modern era.
If you have a 6.2, or 6.5L GM diesel engine, this book is a must-have item for your shop or library.
"Synopsis" may belong to another edition of this title.
About the Author
"About the title" may belong to another edition of this title.
Biblios
frankfurt am main, hessen, Germany
AbeBooks seller since September 10, 2024
Shipping rates from Germany to U.S.A.
| Item | 25 to 45 business days | 8 to 14 business days |
|---|---|---|
| First item | £ 8.52 | £ 16.02 |
Payment methods
Store description
We carry a wide selection of books from South Asia, United States, UK.
Specialty
new books imported from india, uk, usaSeller's business information
Readingos GmbH
Kaiserstraße 47
Frankfurt am Main, Germany 60329
Terms of sale
We ship from Frankfurt
Right of withdrawal
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to Biblios, frankfurt am main, Germany, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
- The delivery of newspapers, journals or magazines with the exception of subscription contracts; and
- The supply of digital content which is not supplied on a tangible medium (e.g. on a CD or DVD) if you accepted when you placed your order that we could start to deliver it, and that you could not withdraw once delivery had started.