4G: Deployment Strategies and Operational Implications
Language: English
Published by Apress, 2014
- Softcover
- New

Condition: New
£ 24.78
Quantity: Over 20 available
Add to basketItem description from seller
Dieser Artikel ist ein Print on Demand Artikel und wird nach Ihrer Bestellung fuer Sie gedruckt. Specific operational requirements drive early network architectural and design decisions for 4G networks. 4G: Deployment Strategies and Operational Implications evaluates the specific design and deployment options and strategies for LTE network bus.
Seller Inventory # 4151702
- Title
- 4G: Deployment Strategies and Operational Implications
- Author
- Trichy Venkataraman Krishnamurthy|Rajaneesh Shetty
- Publisher
- Apress
- Publication year
- 2014
- Condition
- New
- Binding
- Soft cover
- Language
- English
- ISBN 10
- 1430263253
- ISBN 13
- 9781430263258
As telecommunications operators and network engineers understand, specific operational requirements drive early network architectural and design decisions for 4G networks. But they also know that because technology, standards, usage practices, and regulatory regimes change on a continuous basis, so do best practices. 4G: Deployment Strategies and Operational Implications helps you stay up to date by providing the latest innovative and strategic thinking on 4G and LTE deployments. It evaluates specific design and deployment options in depth and offers roadmap evolution strategies for LTE network business development.
Fortunately, as you’ll discover in this book, LTE is a robust and flexible standard for 4G communications. Operators developing 4G deployment strategies have many options, but they must consider the tradeoffs among them in order to maximize the return on investment for LTE networks. This book will show operators how to develop detailed but flexible deployment road maps incorporating business requirements while allowing the agility that expected and unexpected network evolution require. Such road maps help you avoid costly redeployment while leveraging profitable traffic.
Telecommunications experts and authors Trichy Venkataraman Krishnamurthy and Rajaneesh Shetty examine various architectural options provided by the flexibility of LTE and their effect on the general current and future capability of the designed network. They examine specific features of the network, while covering specific architectural deployment strategies through example and then assessing their implications on both near- and long-term operations as well as potential evolutionary paths.
Besides helping you understand and communicate network upgrade and architectural evolution road maps (with options), you will learn:
- How to plan for accessibility, retainability, integrity, availability, and mobility
- How to balance loads effectively
- How to manage the constraints arising from regulation and standardization
- How to manage the many disruptive factors affecting LTE networks
"Synopsis" may belong to another edition of this title.
About the Author
"About the title" may belong to another edition of this title.
Shipping rates from Germany to U.S.A.
| Item | 16 to 45 business days | 16 to 45 business days |
|---|---|---|
| First item | £ 41.53 | £ 41.53 |
Payment methods
- Bank Wire Transfer
- Check
- Paypal
Store description
Online Handel nur mit Neubüchern
Seller's business information
Moluna GmbH
Engberdingdamm 27
Greven, Germany 48268
Terms of sale
About Us
Legal website operator identification:
Moluna GmbH
Represented by the general manager Helge Blischke
Engberdingdamm 27
48268 Greven
Germany
Telephone: 02571/5698933
Telefax: 02571/5698930
E-Mail: abe@moluna.de
VAT No.: DE296281834
listed in the commercial register of the local court Steinfurt
Commercial register number - Part B of the commercial register - 10553
We are a member of the initiative „FairCommerce“ since 24.07.2015.
For more information, see: www.haendlerbund.de/faircommerce.
Right of withdrawal
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to moluna, Greven, Germany, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
- The delivery of newspapers, journals or magazines with the exception of subscription contracts; and
- The supply of digital content which is not supplied on a tangible medium (e.g. on a CD or DVD) if you accepted when you placed your order that we could start to deliver it, and that you could not withdraw once delivery had started.