Items related to Including a Critical Path Method of Project Management...

Including a Critical Path Method of Project Management to Assist the Planning and Tracking of Stability Operations - Softcover

 
9781025064192: Including a Critical Path Method of Project Management to Assist the Planning and Tracking of Stability Operations

Synopsis

In order to facilitate U. S. national security strategy, the U. S. Military has a renewed focus on conducting Stability Operations. These complex operations often take place over long periods and involve various different, but interrelated tasks. Current methods of planning require subjective analysis and previous experiences to determine prioritization when allocating limited resources. Successfully used in civilian industry as a way to plan and execute complex projects, the critical path method might apply to stability operations. The research attempted to determine if applying the critical path method would assist in developing and conducting stability operations. The research includes a review of literature outlining current national strategic requirements for conducting stability operations, followed by a description of current planning methods and a systematic method to apply critical path method to stability operations. After conducting an analytical wargame on three conditions of a case study using the War in Iraq, the conclusion was that combining doctrinal, traditional lines of effort with the application of the critical path method can assist future stability operations.

This work has been selected by scholars as being culturally important, and is part of the knowledge base of civilization as we know it. This work was reproduced from the original artifact, and remains as true to the original work as possible. Therefore, you will see the original copyright references, library stamps (as most of these works have been housed in our most important libraries around the world), and other notations in the work.

This work is in the public domain in the United States of America, and possibly other nations. Within the United States, you may freely copy and distribute this work, as no entity (individual or corporate) has a copyright on the body of the work.

As a reproduction of a historical artifact, this work may contain missing or blurred pages, poor pictures, errant marks, etc. Scholars believe, and we concur, that this work is important enough to be preserved, reproduced, and made generally available to the public. We appreciate your support of the preservation process, and thank you for being an important part of keeping this knowledge alive and relevant.


"synopsis" may belong to another edition of this title.

Buy Used

Condition: As New
Unread book in perfect condition...
View this item

FREE shipping within United Kingdom

Destination, rates & speeds

Other Popular Editions of the Same Title

9781025059549: Including a Critical Path Method of Project Management to Assist the Planning and Tracking of Stability Operations

Featured Edition

ISBN 10:  1025059549 ISBN 13:  9781025059549
Publisher: Hutson Street Press, 2025
Hardcover

Search results for Including a Critical Path Method of Project Management...

Stock Image

Cooper, Joseph S.
Published by Hutson Street Press, 2025
ISBN 10: 1025064194 ISBN 13: 9781025064192
New Softcover

Seller: GreatBookPricesUK, Woodford Green, United Kingdom

Seller rating 5 out of 5 stars 5-star rating, Learn more about seller ratings

Condition: New. Seller Inventory # 50623776-n

Contact seller

Buy New

£ 17.48
Convert currency
Shipping: FREE
Within United Kingdom
Destination, rates & speeds

Quantity: Over 20 available

Add to basket

Stock Image

Joseph S. Cooper
Published by Hutson Street Press, 2025
ISBN 10: 1025064194 ISBN 13: 9781025064192
New Paperback

Seller: CitiRetail, Stevenage, United Kingdom

Seller rating 5 out of 5 stars 5-star rating, Learn more about seller ratings

Paperback. Condition: new. Paperback. In order to facilitate U. S. national security strategy, the U. S. Military has a renewed focus on conducting Stability Operations. These complex operations often take place over long periods and involve various different, but interrelated tasks. Current methods of planning require subjective analysis and previous experiences to determine prioritization when allocating limited resources. Successfully used in civilian industry as a way to plan and execute complex projects, the critical path method might apply to stability operations. The research attempted to determine if applying the critical path method would assist in developing and conducting stability operations. The research includes a review of literature outlining current national strategic requirements for conducting stability operations, followed by a description of current planning methods and a systematic method to apply critical path method to stability operations. After conducting an analytical wargame on three conditions of a case study using the War in Iraq, the conclusion was that combining doctrinal, traditional lines of effort with the application of the critical path method can assist future stability operations.This work has been selected by scholars as being culturally important, and is part of the knowledge base of civilization as we know it. This work was reproduced from the original artifact, and remains as true to the original work as possible. Therefore, you will see the original copyright references, library stamps (as most of these works have been housed in our most important libraries around the world), and other notations in the work.This work is in the public domain in the United States of America, and possibly other nations. Within the United States, you may freely copy and distribute this work, as no entity (individual or corporate) has a copyright on the body of the work.As a reproduction of a historical artifact, this work may contain missing or blurred pages, poor pictures, errant marks, etc. Scholars believe, and we concur, that this work is important enough to be preserved, reproduced, and made generally available to the public. We appreciate your support of the preservation process, and thank you for being an important part of keeping this knowledge alive and relevant. Shipping may be from our UK warehouse or from our Australian or US warehouses, depending on stock availability. Seller Inventory # 9781025064192

Contact seller

Buy New

£ 17.49
Convert currency
Shipping: FREE
Within United Kingdom
Destination, rates & speeds

Quantity: 1 available

Add to basket

Stock Image

Cooper, Joseph S.
Published by Hutson Street Press, 2025
ISBN 10: 1025064194 ISBN 13: 9781025064192
Used Softcover

Seller: GreatBookPricesUK, Woodford Green, United Kingdom

Seller rating 5 out of 5 stars 5-star rating, Learn more about seller ratings

Condition: As New. Unread book in perfect condition. Seller Inventory # 50623776

Contact seller

Buy Used

£ 20.68
Convert currency
Shipping: FREE
Within United Kingdom
Destination, rates & speeds

Quantity: Over 20 available

Add to basket

Stock Image

Cooper, Joseph S
Published by Hutson Street Press, 2025
ISBN 10: 1025064194 ISBN 13: 9781025064192
New Softcover

Seller: California Books, Miami, FL, U.S.A.

Seller rating 5 out of 5 stars 5-star rating, Learn more about seller ratings

Condition: New. Seller Inventory # I-9781025064192

Contact seller

Buy New

£ 16.09
Convert currency
Shipping: £ 7.44
From U.S.A. to United Kingdom
Destination, rates & speeds

Quantity: Over 20 available

Add to basket

Stock Image

Cooper, Joseph S.
Published by Hutson Street Press, 2025
ISBN 10: 1025064194 ISBN 13: 9781025064192
New Softcover

Seller: GreatBookPrices, Columbia, MD, U.S.A.

Seller rating 5 out of 5 stars 5-star rating, Learn more about seller ratings

Condition: New. Seller Inventory # 50623776-n

Contact seller

Buy New

£ 14.06
Convert currency
Shipping: £ 14.87
From U.S.A. to United Kingdom
Destination, rates & speeds

Quantity: Over 20 available

Add to basket

Stock Image

Cooper, Joseph S.
Published by Hutson Street Press, 2025
ISBN 10: 1025064194 ISBN 13: 9781025064192
Used Softcover

Seller: GreatBookPrices, Columbia, MD, U.S.A.

Seller rating 5 out of 5 stars 5-star rating, Learn more about seller ratings

Condition: As New. Unread book in perfect condition. Seller Inventory # 50623776

Contact seller

Buy Used

£ 15.16
Convert currency
Shipping: £ 14.87
From U.S.A. to United Kingdom
Destination, rates & speeds

Quantity: Over 20 available

Add to basket

Seller Image

Joseph S Cooper
ISBN 10: 1025064194 ISBN 13: 9781025064192
New Taschenbuch

Seller: AHA-BUCH GmbH, Einbeck, Germany

Seller rating 5 out of 5 stars 5-star rating, Learn more about seller ratings

Taschenbuch. Condition: Neu. Neuware. Seller Inventory # 9781025064192

Contact seller

Buy New

£ 20.24
Convert currency
Shipping: £ 12.13
From Germany to United Kingdom
Destination, rates & speeds

Quantity: 2 available

Add to basket

Stock Image

Cooper, Joseph S
Published by Hutson Street Press, 2025
ISBN 10: 1025064194 ISBN 13: 9781025064192
New Softcover

Seller: Best Price, Torrance, CA, U.S.A.

Seller rating 5 out of 5 stars 5-star rating, Learn more about seller ratings

Condition: New. SUPER FAST SHIPPING. Seller Inventory # 9781025064192

Contact seller

Buy New

£ 10.76
Convert currency
Shipping: £ 22.30
From U.S.A. to United Kingdom
Destination, rates & speeds

Quantity: 1 available

Add to basket